Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 30 Jinko Tiger Neo 3.0 JKM720N-66HL5-BDV panels (2×15)

2 rows of 15 panels, 21.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
21.60kW
Steel
618.6kg
Posts
22
Bolts
232
Materials
86,188₴
Yield
24,598kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo 3.0 JKM720N-66HL5-BDV panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames11 frames, pitch up to 1,940 mm11 frames, pitch up to 1,940 mm11 frames, pitch up to 1,940 mm
Posts222222
Footings (bored concrete)22 pcs, Ø400 mm, depth 1,100 mm22 pcs, Ø350 mm, depth 1,100 mm22 pcs, Ø300 mm, depth 1,300 mm
Concrete3.35 m³2.56 m³2.22 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,289 mm600 / 2,280 mm600 / 2,280 mm
Panel field size19,965 × 3,105 mm19,965 × 3,110 mm19,965 × 3,110 mm
Row spacing between tables (no shade on 21 December)10,740 mm at noon · 12,080 mm ±2 h11,900 mm at noon · 13,750 mm ±2 h13,050 mm at noon · 15,510 mm ±2 h
Steel623.9 kg618.6 kg634.4 kg
BoltsM10 — 168, M8 — 64M10 — 168, M8 — 64M10 — 168, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials83,133 UAH86,188 UAH92,887 UAH
With installation and delivery138,065 UAH141,120 UAH147,819 UAH
Per 1 kW6,392 UAH/kW6,533 UAH/kW6,843 UAH/kW
Yield1,266 kWh/kW · 27,355 kWh/year1,139 kWh/kW · 24,598 kWh/year1,043 kWh/kW · 22,532 kWh/year
Strength σ/fy62%85%91%
Deflection / (L/200)48%65%69%
Rafter strength92%84%91%
Post utilisation18%24%26%
Utilisation96%99%98%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 278, cantilever 825 mm → strength 92%.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 278, cantilever 825 mm → strength 84%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 278, cantilever 825 mm → strength 91%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.9 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.2 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 99%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 11.0 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 98%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 940 mm, 11 frames. Purlin C-channel 60×40×2: strength 85%, deflection 65% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 940 mm, 11 frames. Purlin C-channel 60×40×2: strength 91%, deflection 69% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,26611
П2Rear postTube 60×60×23,40511
Кр1Rafter (inclined beam)C-channel 80×40×23,92811
Пк1Frame strutC-channel 60×40×21,81211
Х1Longitudinal brace (cross)C-channel 60×40×22,5524
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×21,9652
Р8Purlin (rail)C-channel 60×40×21,9652
—Bolt M10×25 set · purlins, braces, connectors——50
—Bolt M10×90 set · strut to post — through spacer inserts——11
—Bolt M10×100 set · purlin to rafter——44
—Bolt M10×130 set · post–rafter — through spacer inserts——44
—Bolt M10×140 set · strut to rafter — through spacer inserts——11
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 33 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×50 + channel nut——64
—Concrete for 22 posts, Ø350×1100——2.56 m³

Profile cutting

41 bars of 6,000 mm, 215.6 m of profile in total.

  • Tube 60×60×211 bars
  • C-channel 80×40×211 bars
  • C-channel 60×40×219 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
86,188₴
With installation and delivery
141,120₴
Per 1 kW
6,533UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 24,598 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.