Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 12 REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panels (2×6)

2 rows of 6 panels, 7.32 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
7.32kW
Steel
301.8kg
Posts
10
Bolts
104
Materials
38,488₴
Yield
8,336kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pro MG REC610AA Pro MG (HJT, bifacial) panel and the 2 × 6 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 1,880 mm5 frames, pitch up to 1,880 mm5 frames, pitch up to 1,880 mm
Posts101010
Footings (bored concrete)10 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.16 m³1.01 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,154 mm600 / 2,138 mm600 / 2,138 mm
Panel field size8,070 × 2,834 mm8,070 × 2,844 mm8,070 × 2,844 mm
Row spacing between tables (no shade on 21 December)9,810 mm at noon · 11,020 mm ±2 h10,870 mm at noon · 12,550 mm ±2 h11,910 mm at noon · 14,150 mm ±2 h
Steel295.5 kg301.8 kg301.8 kg
BoltsM10 — 76, M8 — 28M10 — 76, M8 — 28M10 — 76, M8 — 28
Panel clampsend 8, middle 20end 8, middle 20end 8, middle 20
Materials37,241 UAH38,488 UAH38,488 UAH
With installation and delivery56,976 UAH58,223 UAH58,223 UAH
Per 1 kW7,784 UAH/kW7,954 UAH/kW7,954 UAH/kW
Yield1,266 kWh/kW · 9,270 kWh/year1,139 kWh/kW · 8,336 kWh/year1,043 kWh/kW · 7,636 kWh/year
Strength σ/fy95%72%77%
Deflection / (L/200)88%53%57%
Rafter strength48%66%71%
Post utilisation15%20%21%
Utilisation98%87%85%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 880 mm, 5 frames. Purlin C-channel 41×41×2.5: strength 95%, deflection 88% of L/200 (snow on panel 489 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.1 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.7 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.5 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 85%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4165
П2Rear postTube 60×60×23,4635
Кр1Rafter (inclined beam)Tube 60×60×23,6105
Пк1Frame strutC-channel 60×40×21,6885
Х1Longitudinal brace (cross)C-channel 60×40×22,4174
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×22,0702
Р4Purlin (rail)C-channel 60×40×22,0702
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——63
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——13
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——20
—Bolt M8×50 + channel nut——28
—Concrete for 10 posts, Ø300×1300——1.01 m³

Profile cutting

19 bars of 6,000 mm, 97.8 m of profile in total.

  • Tube 60×60×210 bars
  • C-channel 60×40×29 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
38,488₴
With installation and delivery
58,223₴
Per 1 kW
7,954UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm10 bar21012,600
C-channel 60×40×2, stock length 6 000 mm9 bar23012,420
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×140 cl. 8.8 set — frame, struts25 pcs22550
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors46 pcs221,012
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts13 pcs27351
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)20 pcs32640
Bolt M8×50 A2 + spring channel nut M831 pcs14434
Post base anchor pin (M10 / rebar Ø12)10 pcs20200
Borehole casing (roofing felt / PVC, 300 mm)10 pcs60600
Crushed stone 20–40 for the bottom of the boreholes0.07 m³90063
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow24 m35840
Module earthing clip (under the clamp)12 pcs20240
Cable clip, stainless36 pcs5180
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.01 m³3,8003,838
Rebar Ø10 (4 bars per post)60 m281,680
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 5 × 70 mm, 4 × 30 mm, 5 × 10 mm18 pcs00
Materials38,488

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 8,336 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.