Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 10 Astronergy ASTRO N7s CHSM54RN(DG)/F-BH-520 panels (1×10)

1 row of 10 panels, 5.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
5.20kW
Steel
210.6kg
Posts
12
Bolts
88
Materials
30,432₴
Yield
5,922kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N7s CHSM54RN(DG)/F-BH-520 panel and the 1 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 2,710 mm6 frames, pitch up to 2,200 mm6 frames, pitch up to 2,200 mm
Posts101212
Footings (bored concrete)10 pcs, Ø300 mm, depth 900 mm12 pcs, Ø300 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete0.70 m³1.03 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,198 mm600 / 1,198 mm600 / 1,198 mm
Panel field size11,660 × 1,216 mm11,660 × 1,216 mm11,660 × 1,216 mm
Row spacing between tables (no shade on 21 December)4,400 mm at noon · 4,950 mm ±2 h4,880 mm at noon · 5,630 mm ±2 h5,350 mm at noon · 6,350 mm ±2 h
Steel187.6 kg210.6 kg219.3 kg
BoltsM10 — 58, M8 — 22M10 — 66, M8 — 22M10 — 66, M8 — 22
Panel clampsend 4, middle 18end 4, middle 18end 4, middle 18
Materials26,904 UAH30,432 UAH32,628 UAH
With installation and delivery41,134 UAH44,617 UAH46,813 UAH
Per 1 kW7,910 UAH/kW8,580 UAH/kW9,003 UAH/kW
Yield1,266 kWh/kW · 6,585 kWh/year1,139 kWh/kW · 5,922 kWh/year1,043 kWh/kW · 5,424 kWh/year
Strength σ/fy94%86%93%
Deflection / (L/200)100%74%80%
Rafter strength13%14%16%
Post utilisation6%7%7%
Utilisation82%48%40%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 710 mm, 5 frames. Purlin C-channel 60×40×2: strength 94%, deflection 100% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 86%, deflection 74% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 93%, deflection 80% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 900: 0.064 m³ of concrete per post. Wind uplift on the front post ≈ 6.4 kN (with γ=1.5) vs ≈ 7.7 kN (concrete weight + soil friction, estimate) → 82%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×21,9526
П2Rear postTube 60×60×22,3236
Кр1Rafter (inclined beam)C-channel 60×40×21,2816
Пк1Frame strutC-channel 60×40×28776
Х1Longitudinal brace (cross)C-channel 60×40×22,3064
Р1Purlin (rail)C-channel 60×40×26,0001
Р2Purlin (rail)C-channel 60×40×26,0001
Р3Purlin (rail)C-channel 60×40×25,6601
Р4Purlin (rail)C-channel 60×40×25,6601
—Bolt M10×25 set · purlins, braces, connectors——10
—Bolt M10×80 set · purlin to rafter——12
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×130 set · post–rafter — through spacer inserts——24
—Bolt M10×140 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——4
—Mid clamp (30–40 mm)——18
—Bolt M8×50 + channel nut——22
—Concrete for 12 posts, Ø300×1100——1.03 m³

Profile cutting

13 bars of 6,000 mm, 71.1 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
30,432₴
With installation and delivery
44,617₴
Per 1 kW
8,580UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 5,922 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 1×10 layout with other panels