Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 10 Astronergy ASTRO N7s CHSM54RN(DG)/F-BH-520 panels (2×5)

2 rows of 5 panels, 5.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
5.20kW
Steel
210.5kg
Posts
8
Bolts
74
Materials
28,831₴
Yield
5,922kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N7s CHSM54RN(DG)/F-BH-520 panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm
Posts888
Footings (bored concrete)8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete0.68 m³0.68 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,981 mm600 / 1,981 mm600 / 1,981 mm
Panel field size5,890 × 2,571 mm5,890 × 2,571 mm5,890 × 2,571 mm
Row spacing between tables (no shade on 21 December)8,850 mm at noon · 9,940 mm ±2 h9,800 mm at noon · 11,320 mm ±2 h10,740 mm at noon · 12,770 mm ±2 h
Steel210.5 kg210.5 kg216.2 kg
BoltsM10 — 50, M8 — 24M10 — 50, M8 — 24M10 — 50, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials28,831 UAH28,831 UAH29,493 UAH
With installation and delivery43,061 UAH43,061 UAH43,723 UAH
Per 1 kW8,281 UAH/kW8,281 UAH/kW8,408 UAH/kW
Yield1,266 kWh/kW · 6,585 kWh/year1,139 kWh/kW · 5,922 kWh/year1,043 kWh/kW · 5,424 kWh/year
Strength σ/fy42%58%62%
Deflection / (L/200)30%40%43%
Rafter strength57%78%83%
Post utilisation11%16%17%
Utilisation98%85%71%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.2 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.1 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 85%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 892, cantilever 685 mm → strength 83%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1604
П2Rear postTube 60×60×23,1064
Кр1Rafter (inclined beam)C-channel 60×40×23,2624
Пк1Frame strutC-channel 60×40×21,5514
Х1Longitudinal brace (cross)C-channel 60×40×22,2434
Р1Purlin (rail)C-channel 60×40×25,8904
—Bolt M10×25 set · purlins, braces, connectors——2
—Bolt M10×80 set · purlin to rafter——16
—Bolt M10×90 set · strut to post — through spacer inserts——4
—Bolt M10×130 set · post–rafter — through spacer inserts——16
—Bolt M10×140 set · strut to rafter — through spacer inserts——4
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 8 posts, Ø300×1100——0.68 m³

Profile cutting

14 bars of 6,000 mm, 72.9 m of profile in total.

  • Tube 60×60×24 bars
  • C-channel 60×40×210 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
28,831₴
With installation and delivery
43,061₴
Per 1 kW
8,281UAH/kW

The engine's estimate has 22 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 5,922 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×5 layout with other panels

Next