Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 10 Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panels (2×5)

2 rows of 5 panels, 6.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
6.60kW
Steel
260.6kg
Posts
10
Bolts
84
Materials
32,944₴
Yield
7,516kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 1,780 mm5 frames, pitch up to 1,370 mm4 frames, pitch up to 1,780 mm
Posts8108
Footings (bored concrete)8 pcs, Ø400 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø350 mm, depth 1,300 mm
Concrete1.22 m³0.86 m³1.10 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,287 mm600 / 2,287 mm600 / 2,270 mm
Panel field size5,890 × 3,102 mm5,890 × 3,102 mm5,890 × 3,112 mm
Row spacing between tables (no shade on 21 December)10,730 mm at noon · 12,070 mm ±2 h11,890 mm at noon · 13,740 mm ±2 h13,040 mm at noon · 15,490 mm ±2 h
Steel228.2 kg260.6 kg253.6 kg
BoltsM10 — 50, M8 — 24M10 — 60, M8 — 24M10 — 50, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials30,919 UAH32,944 UAH39,493 UAH
With installation and delivery48,649 UAH50,624 UAH57,223 UAH
Per 1 kW7,371 UAH/kW7,670 UAH/kW8,670 UAH/kW
Yield1,266 kWh/kW · 8,358 kWh/year1,139 kWh/kW · 7,516 kWh/year1,043 kWh/kW · 6,885 kWh/year
Strength σ/fy52%42%76%
Deflection / (L/200)37%23%53%
Rafter strength84%88%42%
Post utilisation16%17%24%
Utilisation88%84%75%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionpasses

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 84%.Cherkasy: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 88%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 7.9 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 84%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2745
П2Rear postTube 60×60×23,4125
Кр1Rafter (inclined beam)C-channel 60×40×23,9245
Пк1Frame strutC-channel 60×40×21,8185
Х1Longitudinal brace (cross)C-channel 60×40×22,1474
Р1Purlin (rail)C-channel 60×40×25,8904
—Bolt M10×25 set · purlins, braces, connectors——2
—Bolt M10×80 set · purlin to rafter——20
—Bolt M10×90 set · strut to post — through spacer inserts——5
—Bolt M10×130 set · post–rafter — through spacer inserts——20
—Bolt M10×140 set · strut to rafter — through spacer inserts——5
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 10 posts, Ø300×1100——0.86 m³

Profile cutting

16 bars of 6,000 mm, 89.3 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×211 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
32,944₴
With installation and delivery
50,624₴
Per 1 kW
7,670UAH/kW

The engine's estimate has 22 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 7,516 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×5 layout with other panels

Next