Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 40 Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panels (2×20)

2 rows of 20 panels, 26.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
26.40kW
Steel
721.4kg
Posts
26
Bolts
272
Materials
102,335₴
Yield
30,064kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames13 frames, pitch up to 1,890 mm13 frames, pitch up to 1,890 mm13 frames, pitch up to 1,890 mm
Posts262626
Footings (bored concrete)26 pcs, Ø400 mm, depth 1,100 mm26 pcs, Ø350 mm, depth 1,100 mm26 pcs, Ø300 mm, depth 1,300 mm
Concrete3.95 m³3.03 m³2.63 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,287 mm600 / 2,278 mm600 / 2,278 mm
Panel field size23,200 × 3,102 mm23,200 × 3,107 mm23,200 × 3,107 mm
Row spacing between tables (no shade on 21 December)10,730 mm at noon · 12,070 mm ±2 h11,890 mm at noon · 13,740 mm ±2 h13,040 mm at noon · 15,490 mm ±2 h
Steel727.7 kg721.4 kg740.1 kg
BoltsM10 — 188, M8 — 84M10 — 188, M8 — 84M10 — 188, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials96,663 UAH102,335 UAH110,132 UAH
With installation and delivery163,400 UAH169,072 UAH176,869 UAH
Per 1 kW6,189 UAH/kW6,404 UAH/kW6,700 UAH/kW
Yield1,266 kWh/kW · 33,434 kWh/year1,139 kWh/kW · 30,064 kWh/year1,043 kWh/kW · 27,539 kWh/year
Strength σ/fy59%80%86%
Deflection / (L/200)44%60%64%
Rafter strength89%82%88%
Post utilisation17%23%25%
Utilisation94%96%96%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 89%.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 82%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 88%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.5 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 94%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.9 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 96%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.7 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 96%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 890 mm, 13 frames. Purlin C-channel 60×40×2: strength 80%, deflection 60% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 890 mm, 13 frames. Purlin C-channel 60×40×2: strength 86%, deflection 64% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,26513
П2Rear postTube 60×60×23,40313
Кр1Rafter (inclined beam)C-channel 80×40×23,92413
Пк1Frame strutC-channel 60×40×21,81113
Х1Longitudinal brace (cross)C-channel 60×40×22,5124
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×25,2002
Р8Purlin (rail)C-channel 60×40×25,2002
—Bolt M10×25 set · purlins, braces, connectors——50
—Bolt M10×90 set · strut to post — through spacer inserts——13
—Bolt M10×100 set · purlin to rafter——52
—Bolt M10×130 set · post–rafter — through spacer inserts——52
—Bolt M10×140 set · strut to rafter — through spacer inserts——13
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×50 + channel nut——84
—Concrete for 26 posts, Ø350×1100——3.03 m³

Profile cutting

49 bars of 6,000 mm, 251.1 m of profile in total.

  • Tube 60×60×213 bars
  • C-channel 80×40×213 bars
  • C-channel 60×40×223 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
102,335₴
With installation and delivery
169,072₴
Per 1 kW
6,404UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 30,064 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×20 layout with other panels

Next