52 Ulica UL-620M-132DDGN (dual glass bifacial) panels (32.24 kW) on 2 tables of 2 × 13. Snow and wind per the DBN for Cherkasy: S₀ 1,520 Pa, W₀ 420 Pa.

Power
32.24kW
Steel
928.5kg
Posts
32
Bolts
356
Materials
135,050₴
Yield
36,714kWh/year

Ground frame designer

Design the 30 kW plant in the builder

Opens the 2 × 13 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Cherkasy.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Panel

Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.

One table's structure (tables: 2)

Layout2 tables, each 2 × 13 = 26 panels
Loads (DBN V.1.2-2:2006)snow S₀ 1,520 Pa, wind W₀ 420 Pa, frost depth 1.0 m
PostsTube 60×60×2
RaftersC-channel 80×40×2
Purlins and bracesC-channel 60×40×2
Frames8 frames, pitch up to 2,070 mm
Posts16
Footings (bored concrete)16 pcs, Ø400 mm, depth 1,100 mm
Concrete2.43 m³
Tilt30°
Panel bottom / post top600 / 2,278 mm
Panel field size15,122 × 3,107 mm
Row spacing between tables (no shade on 21 December)11,890 mm at noon · 13,740 mm ±2 h
Steel464.2 kg
BoltsM10 — 122, M8 — 56
Panel clampsend 8, middle 48
Materials67,525 UAH
With installation and delivery108,885 UAH
Per 1 kW6,755 UAH/kW
Yield1,139 kWh/kW · 18,357 kWh/year

Checks and cautions

CheckValueStatus
Strength σ/fy96%with a caution
Deflection / (L/200)78%passes
Rafter strength90%with a caution
Post utilisation26%passes
Utilisation90%with a caution
Depth vs frost depthokpasses
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Frame spacing 2 070 mm, 8 frames. Purlin C-channel 60×40×2: strength 96%, deflection 78% of L/200 (snow on panel 977 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 90%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.0 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 90%.

Bill of materials

The bill of materials and the estimate are per table; tables: 2.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2658
П2Rear postTube 60×60×23,4038
Кр1Rafter (inclined beam)C-channel 80×40×23,9248
Пк1Frame strutC-channel 60×40×21,8118
Х1Longitudinal brace (cross)C-channel 60×40×22,6534
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×23,1222
Р6Purlin (rail)C-channel 60×40×23,1222
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×100 set · purlin to rafter——32
—Bolt M10×130 set · post–rafter — through spacer inserts——32
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——48
—Bolt M8×50 + channel nut——56
—Concrete for 16 posts, Ø400×1100——2.43 m³

Profile cutting

31 bars of 6,000 mm, 162.3 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 80×40×28 bars
  • C-channel 60×40×215 bars

Estimated cost

The bill of materials and the estimate are per table; tables: 2.

Materials per table
67,525₴
With installation and delivery
108,885₴
Per 1 kW
6,755UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Materials for all tables (2): 135,050 UAH.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 36,714 kWh a year in total for Cherkasy (tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.