Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 24 Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panels (2×12)

2 rows of 12 panels, 15.84 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
15.84kW
Steel
450.9kg
Posts
16
Bolts
174
Materials
63,610₴
Yield
18,038kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames8 frames, pitch up to 1,910 mm8 frames, pitch up to 1,910 mm8 frames, pitch up to 1,910 mm
Posts161616
Footings (bored concrete)16 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø350 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,300 mm
Concrete2.43 m³1.86 m³1.62 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,287 mm600 / 2,278 mm600 / 2,278 mm
Panel field size13,968 × 3,102 mm13,968 × 3,107 mm13,968 × 3,107 mm
Row spacing between tables (no shade on 21 December)10,730 mm at noon · 12,070 mm ±2 h11,890 mm at noon · 13,740 mm ±2 h13,040 mm at noon · 15,490 mm ±2 h
Steel454.8 kg450.9 kg462.5 kg
BoltsM10 — 122, M8 — 52M10 — 122, M8 — 52M10 — 122, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials61,621 UAH63,610 UAH68,038 UAH
With installation and delivery102,281 UAH104,270 UAH108,698 UAH
Per 1 kW6,457 UAH/kW6,583 UAH/kW6,862 UAH/kW
Yield1,266 kWh/kW · 20,060 kWh/year1,139 kWh/kW · 18,038 kWh/year1,043 kWh/kW · 16,523 kWh/year
Strength σ/fy60%82%88%
Deflection / (L/200)45%62%66%
Rafter strength90%83%89%
Post utilisation18%24%25%
Utilisation95%97%97%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 90%.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 83%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 89%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 95%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.1 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.8 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 97%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 910 mm, 8 frames. Purlin C-channel 60×40×2: strength 82%, deflection 62% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 910 mm, 8 frames. Purlin C-channel 60×40×2: strength 88%, deflection 66% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2658
П2Rear postTube 60×60×23,4038
Кр1Rafter (inclined beam)C-channel 80×40×23,9248
Пк1Frame strutC-channel 60×40×21,8118
Х1Longitudinal brace (cross)C-channel 60×40×22,5284
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×21,9682
Р6Purlin (rail)C-channel 60×40×21,9682
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×100 set · purlin to rafter——32
—Bolt M10×130 set · post–rafter — through spacer inserts——32
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 16 posts, Ø350×1100——1.86 m³

Profile cutting

30 bars of 6,000 mm, 157.2 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 80×40×28 bars
  • C-channel 60×40×214 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
63,610₴
With installation and delivery
104,270₴
Per 1 kW
6,583UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 18,038 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×12 layout with other panels