Astronergy

Ground frame for 20 Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panels (2×10)

2 rows of 10 panels, 13.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
13.20kW
Steel
391.5kg
Posts
14
Bolts
140
Materials
56,390₴
Yield
15,032kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N7 Pro CHSM66RN(DG)/F-BQ-660 panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames7 frames, pitch up to 1,850 mm7 frames, pitch up to 1,850 mm7 frames, pitch up to 1,850 mm
Posts141414
Footings (bored concrete)14 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø350 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete2.13 m³1.63 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,287 mm600 / 2,278 mm600 / 2,278 mm
Panel field size11,660 × 3,102 mm11,660 × 3,107 mm11,660 × 3,107 mm
Row spacing between tables (no shade on 21 December)10,730 mm at noon · 12,070 mm ±2 h11,890 mm at noon · 13,740 mm ±2 h13,040 mm at noon · 15,490 mm ±2 h
Steel394.9 kg391.5 kg401.6 kg
BoltsM10 — 96, M8 — 44M10 — 96, M8 — 44M10 — 96, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials52,935 UAH56,390 UAH60,913 UAH
With installation and delivery87,017 UAH90,472 UAH94,995 UAH
Per 1 kW6,592 UAH/kW6,854 UAH/kW7,197 UAH/kW
Yield1,266 kWh/kW · 16,717 kWh/year1,139 kWh/kW · 15,032 kWh/year1,043 kWh/kW · 13,769 kWh/year
Strength σ/fy57%77%83%
Deflection / (L/200)41%56%60%
Rafter strength87%80%86%
Post utilisation17%23%25%
Utilisation92%94%94%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 87%.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 80%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 86%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.2 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 92%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.7 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 94%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.5 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 94%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 850 mm, 7 frames. Purlin C-channel 60×40×2: strength 83%, deflection 60% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2657
П2Rear postTube 60×60×23,4037
Кр1Rafter (inclined beam)C-channel 80×40×23,9247
Пк1Frame strutC-channel 60×40×21,8117
Х1Longitudinal brace (cross)C-channel 60×40×22,4824
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×25,6602
Р4Purlin (rail)C-channel 60×40×25,6602
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×100 set · purlin to rafter——28
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×50 + channel nut——44
—Concrete for 14 posts, Ø350×1100——1.63 m³

Profile cutting

27 bars of 6,000 mm, 136.4 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 80×40×27 bars
  • C-channel 60×40×213 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
56,390₴
With installation and delivery
90,472₴
Per 1 kW
6,854UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 15,032 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.