Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 40 REC Alpha Pure-RX REC470AA Pure-RX (HJT) panels (4×10)

4 rows of 10 panels, 18.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
18.80kW
Steel
892.7kg
Posts
24
Bolts
338
Materials
106,402₴
Yield
21,409kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure-RX REC470AA Pure-RX (HJT) panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames7 frames, pitch up to 1,960 mm8 frames, pitch up to 1,690 mm8 frames, pitch up to 1,690 mm
Posts142424
Footings (bored concrete)14 pcs, Ø450 mm, depth 1,500 mm24 pcs, Ø400 mm, depth 1,300 mm24 pcs, Ø350 mm, depth 1,500 mm
Concrete3.67 m³4.31 m³3.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,194 mm600 / 3,420 mm600 / 3,420 mm
Panel field size12,370 × 4,675 mm12,370 × 5,026 mm12,370 × 5,026 mm
Row spacing between tables (no shade on 21 December)15,640 mm at noon · 17,590 mm ±2 h17,330 mm at noon · 20,020 mm ±2 h19,000 mm at noon · 22,580 mm ±2 h
Steel776.8 kg892.7 kg909.9 kg
BoltsM10 — 214, M8 — 88M10 — 250, M8 — 88M10 — 250, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials101,351 UAH106,402 UAH104,999 UAH
With installation and delivery149,276 UAH154,804 UAH153,401 UAH
Per 1 kW7,940 UAH/kW8,234 UAH/kW8,160 UAH/kW
Yield1,266 kWh/kW · 23,809 kWh/year1,139 kWh/kW · 21,409 kWh/year1,043 kWh/kW · 19,611 kWh/year
Strength σ/fy87%86%92%
Deflection / (L/200)85%72%77%
Rafter strength90%93%100%
Post utilisation43%55%59%
Utilisation99%100%99%
Depth vs frost depthokokok
Bolt utilisation37%20%21%
Plate section8%0%0%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3—17%18%
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 960 mm, 7 frames. Purlin C-channel 41×41×2.5: strength 87%, deflection 85% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 690 mm, 8 frames. Purlin C-channel 41×41×2.5: strength 86%, deflection 72% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 690 mm, 8 frames. Purlin C-channel 41×41×2.5: strength 92%, deflection 77% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 719, cantilever 1 347 mm → strength 90%.Cherkasy: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 277 mm, cantilever 929 mm — continuous beam on 3 supports → strength 93%.Chernihiv: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 277 mm, cantilever 929 mm — continuous beam on 3 supports → strength 100%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 20.9 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.8 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 100%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 15.4 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 99%.
  • Stock length, mmKherson: Rafter 6 412 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 6 000, Кр1б 412 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 6 000 mm from the lower end of the rafter, where the moment is small. Bolt: 6.69 kN vs 18.00 kN (37%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 412 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 000, Кр1б 1 412 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 000 mm from the lower end of the rafter, where the moment is small. Bolt: 4.36 kN vs 22.27 kN (20%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 412 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 5 000, Кр1б 1 412 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 5 000 mm from the lower end of the rafter, where the moment is small. Bolt: 4.67 kN vs 22.27 kN (21%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4688
П2Rear postTube 60×60×24,7458
П3Middle postTube 60×60×23,6078
Кр1аRafter (inclined beam)Tube 60×60×25,0008
Кр1бRafter (inclined beam)Tube 60×60×21,4128
Н1Rafter splice plateTube 60×60×23008
Пк1Frame strutC-channel 41×41×2.52,8318
Пк2Front frame strutC-channel 41×41×2.51,8148
Х1Longitudinal brace (cross)C-channel 41×41×2.53,2524
Р1Purlin (rail)C-channel 41×41×2.56,0004
Р2Purlin (rail)C-channel 41×41×2.56,0004
Р3Purlin (rail)C-channel 41×41×2.56,0004
Р4Purlin (rail)C-channel 41×41×2.56,0004
Р5Purlin (rail)C-channel 41×41×2.53704
Р6Purlin (rail)C-channel 41×41×2.53704
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——194
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×150 set · strut to rafter — through spacer inserts——16
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×140 set · rafter splice (plate Н1)——32
—End clamp 30 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 24 posts, Ø400×1300——4.31 m³

Profile cutting

54 bars of 6,000 mm, 289.4 m of profile in total.

  • Tube 60×60×228 bars
  • C-channel 41×41×2.526 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
106,402₴
With installation and delivery
154,804₴
Per 1 kW
8,234UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm28 bar21035,280
C-channel 41×41×2.5, stock length 6 000 mm26 bar20031,200
C-channel connector (splice plate L 300)16 pcs901,440
Bolt M10×140 cl. 8.8 set — frame, struts64 pcs221,408
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors155 pcs223,410
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×150 cl. 8.8 set — strut to rafter — through spacer inserts16 pcs27432
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×140 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 30 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)24 pcs20480
Borehole casing (roofing felt / PVC, 300 mm)24 pcs601,440
Crushed stone 20–40 for the bottom of the boreholes0.30 m³900270
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow34 m351,190
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml4 pcs3501,400
Concrete M200 for posts4.31 m³3,80016,378
Rebar Ø10 (4 bars per post)144 m284,032
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 16 × 70 mm, 4 × 30 mm, 16 × 10 mm40 pcs00
Materials106,402

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 21,409 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 4×10 layout with other panels

Next