Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 10 REC Alpha Pure-RX REC470AA Pure-RX (HJT) panels (2×5)

2 rows of 5 panels, 4.70 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
4.70kW
Steel
217.4kg
Posts
8
Bolts
90
Materials
27,770₴
Yield
5,352kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure-RX REC470AA Pure-RX (HJT) panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 1,890 mm4 frames, pitch up to 1,890 mm4 frames, pitch up to 1,890 mm
Posts888
Footings (bored concrete)8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete0.68 m³0.68 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,830 mm600 / 1,814 mm600 / 1,814 mm
Panel field size6,245 × 2,273 mm6,245 × 2,282 mm6,245 × 2,282 mm
Row spacing between tables (no shade on 21 December)7,800 mm at noon · 8,770 mm ±2 h8,640 mm at noon · 9,980 mm ±2 h9,470 mm at noon · 11,260 mm ±2 h
Steel218.1 kg217.4 kg223.1 kg
BoltsM10 — 66, M8 — 24M10 — 66, M8 — 24M10 — 66, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials26,510 UAH27,770 UAH28,432 UAH
With installation and delivery39,722 UAH40,982 UAH41,644 UAH
Per 1 kW8,451 UAH/kW8,720 UAH/kW8,860 UAH/kW
Yield1,266 kWh/kW · 5,952 kWh/year1,139 kWh/kW · 5,352 kWh/year1,043 kWh/kW · 4,903 kWh/year
Strength σ/fy74%57%61%
Deflection / (L/200)69%42%45%
Rafter strength31%43%46%
Post utilisation10%13%14%
Utilisation88%77%64%
Depth vs frost depthokokok
Checks overallwith a cautionpassespasses

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.4 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 88%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0934
П2Rear postTube 60×60×22,9394
Кр1Rafter (inclined beam)Tube 60×60×22,9164
Пк1Frame strutC-channel 60×40×21,4064
Х1Longitudinal brace (cross)C-channel 60×40×22,2444
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×22452
Р4Purlin (rail)C-channel 60×40×22452
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——54
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——12
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 8 posts, Ø300×1100——0.68 m³

Profile cutting

13 bars of 6,000 mm, 71.4 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 60×40×27 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
27,770₴
With installation and delivery
40,982₴
Per 1 kW
8,720UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm6 bar2107,560
C-channel 60×40×2, stock length 6 000 mm7 bar2309,660
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×140 cl. 8.8 set — frame, struts20 pcs22440
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors41 pcs22902
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts12 pcs27324
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)16 pcs32512
Bolt M8×50 A2 + spring channel nut M827 pcs14378
Post base anchor pin (M10 / rebar Ø12)8 pcs20160
Borehole casing (roofing felt / PVC, 300 mm)8 pcs60480
Crushed stone 20–40 for the bottom of the boreholes0.06 m³90054
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow20 m35700
Module earthing clip (under the clamp)10 pcs20200
Cable clip, stainless30 pcs5150
Zinc paint / cold galvanising spray 400 ml1 pcs350350
Concrete M200 for posts0.68 m³3,8002,584
Rebar Ø10 (4 bars per post)42 m281,176
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 4 × 70 mm, 4 × 30 mm, 4 × 10 mm16 pcs00
Materials27,770

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 5,352 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.