Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 10 REC Alpha Pure-RX REC470AA Pure-RX (HJT) panels (1×10)

1 row of 10 panels, 4.70 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
4.70kW
Steel
210.2kg
Posts
12
Bolts
96
Materials
30,850₴
Yield
5,352kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure-RX REC470AA Pure-RX (HJT) panel and the 1 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,330 mm6 frames, pitch up to 2,330 mm6 frames, pitch up to 2,330 mm
Posts121212
Footings (bored concrete)12 pcs, Ø300 mm, depth 900 mm12 pcs, Ø300 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete0.84 m³1.03 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,123 mm600 / 1,123 mm600 / 1,123 mm
Panel field size12,370 × 1,087 mm12,370 × 1,087 mm12,370 × 1,087 mm
Row spacing between tables (no shade on 21 December)3,880 mm at noon · 4,360 mm ±2 h4,300 mm at noon · 4,970 mm ±2 h4,710 mm at noon · 5,600 mm ±2 h
Steel201.5 kg210.2 kg218.8 kg
BoltsM10 — 74, M8 — 22M10 — 74, M8 — 22M10 — 74, M8 — 22
Panel clampsend 4, middle 18end 4, middle 18end 4, middle 18
Materials28,588 UAH30,850 UAH33,046 UAH
With installation and delivery41,518 UAH43,780 UAH45,976 UAH
Per 1 kW8,834 UAH/kW9,315 UAH/kW9,782 UAH/kW
Yield1,266 kWh/kW · 5,952 kWh/year1,139 kWh/kW · 5,352 kWh/year1,043 kWh/kW · 4,903 kWh/year
Strength σ/fy61%85%91%
Deflection / (L/200)56%78%84%
Rafter strength9%13%14%
Post utilisation4%6%7%
Utilisation62%45%37%
Depth vs frost depthokokok
Checks overallpasseswith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 330 mm, 6 frames. Purlin C-channel 60×40×2: strength 85%, deflection 78% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 330 mm, 6 frames. Purlin C-channel 60×40×2: strength 91%, deflection 84% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×21,9106
П2Rear postTube 60×60×22,2486
Кр1Rafter (inclined beam)C-channel 60×40×21,1686
Пк1Frame strutC-channel 60×40×28136
Х1Longitudinal brace (cross)C-channel 60×40×22,4184
Р1Purlin (rail)C-channel 60×40×26,0001
Р2Purlin (rail)C-channel 60×40×26,0001
Р3Purlin (rail)C-channel 60×40×26,0001
Р4Purlin (rail)C-channel 60×40×26,0001
Р5Purlin (rail)C-channel 60×40×23701
Р6Purlin (rail)C-channel 60×40×23701
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——12
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×130 set · post–rafter — through spacer inserts——24
—Bolt M10×140 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——4
—Mid clamp (30–40 mm)——18
—Bolt M8×50 + channel nut——22
—Concrete for 12 posts, Ø300×1100——1.03 m³

Profile cutting

13 bars of 6,000 mm, 71.3 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
30,850₴
With installation and delivery
43,780₴
Per 1 kW
9,315UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 5,352 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 1×10 layout with other panels

Next