Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 24 REC Alpha Pure-RX REC470AA Pure-RX (HJT) panels (2×12)

2 rows of 12 panels, 11.28 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
11.28kW
Steel
387.2kg
Posts
14
Bolts
164
Materials
52,042₴
Yield
12,845kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure-RX REC470AA Pure-RX (HJT) panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,800 mm7 frames, pitch up to 2,350 mm7 frames, pitch up to 2,350 mm
Posts121414
Footings (bored concrete)12 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete1.83 m³1.20 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,814 mm600 / 1,814 mm600 / 1,814 mm
Panel field size14,820 × 2,282 mm14,820 × 2,282 mm14,820 × 2,282 mm
Row spacing between tables (no shade on 21 December)7,800 mm at noon · 8,770 mm ±2 h8,640 mm at noon · 9,980 mm ±2 h9,470 mm at noon · 11,260 mm ±2 h
Steel362.1 kg387.2 kg397.2 kg
BoltsM10 — 102, M8 — 52M10 — 112, M8 — 52M10 — 112, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials51,001 UAH52,042 UAH53,186 UAH
With installation and delivery80,361 UAH81,352 UAH82,496 UAH
Per 1 kW7,124 UAH/kW7,212 UAH/kW7,313 UAH/kW
Yield1,266 kWh/kW · 14,285 kWh/year1,139 kWh/kW · 12,845 kWh/year1,043 kWh/kW · 11,766 kWh/year
Strength σ/fy90%88%94%
Deflection / (L/200)100%81%87%
Rafter strength70%81%87%
Post utilisation14%17%18%
Utilisation93%96%79%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 800 mm, 6 frames. Purlin C-channel 60×40×2: strength 90%, deflection 100% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 350 mm, 7 frames. Purlin C-channel 60×40×2: strength 88%, deflection 81% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 350 mm, 7 frames. Purlin C-channel 60×40×2: strength 94%, deflection 87% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.4 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 93%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 96%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 691, cantilever 612 mm → strength 81%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 691, cantilever 612 mm → strength 87%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0937
П2Rear postTube 60×60×22,9397
Кр1Rafter (inclined beam)C-channel 60×40×22,9167
Пк1Frame strutC-channel 60×40×21,4067
Х1Longitudinal brace (cross)C-channel 60×40×22,6514
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×22,8202
Р6Purlin (rail)C-channel 60×40×22,8202
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

25 bars of 6,000 mm, 135.4 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×218 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
52,042₴
With installation and delivery
81,352₴
Per 1 kW
7,212UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 12,845 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).