REC
Ground frame for 30 REC Alpha Pure-RX REC470AA Pure-RX (HJT) panels (2×15)
2 rows of 15 panels, 14.10 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 14.10kW
- Steel
- 483.0kg
- Posts
- 18
- Bolts
- 212
- Materials
- 63,303₴
- Yield
- 16,057kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the REC Alpha Pure-RX REC470AA Pure-RX (HJT) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Purlins and braces | C-channel 41×41×2.5 | C-channel 60×40×2 | C-channel 60×40×2 |
| Frames | 10 frames, pitch up to 1,990 mm | 9 frames, pitch up to 2,230 mm | 9 frames, pitch up to 2,230 mm |
| Posts | 20 | 18 | 18 |
| Footings (bored concrete) | 20 pcs, Ø350 mm, depth 900 mm | 18 pcs, Ø300 mm, depth 1,100 mm | 18 pcs, Ø300 mm, depth 1,300 mm |
| Concrete | 1.91 m³ | 1.54 m³ | 1.82 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 1,830 mm | 600 / 1,814 mm | 600 / 1,814 mm |
| Panel field size | 18,495 × 2,273 mm | 18,495 × 2,282 mm | 18,495 × 2,282 mm |
| Row spacing between tables (no shade on 21 December) | 7,800 mm at noon · 8,770 mm ±2 h | 8,640 mm at noon · 9,980 mm ±2 h | 9,470 mm at noon · 11,260 mm ±2 h |
| Steel | 497.3 kg | 483.0 kg | 495.9 kg |
| Bolts | M10 — 158, M8 — 64 | M10 — 148, M8 — 64 | M10 — 148, M8 — 64 |
| Panel clamps | end 8, middle 56 | end 8, middle 56 | end 8, middle 56 |
| Materials | 63,759 UAH | 63,303 UAH | 64,759 UAH |
| With installation and delivery | 99,959 UAH | 99,585 UAH | 101,041 UAH |
| Per 1 kW | 7,089 UAH/kW | 7,063 UAH/kW | 7,166 UAH/kW |
| Yield | 1,266 kWh/kW · 17,857 kWh/year | 1,139 kWh/kW · 16,057 kWh/year | 1,043 kWh/kW · 14,708 kWh/year |
| Strength σ/fy | 82% | 79% | 85% |
| Deflection / (L/200) | 81% | 69% | 74% |
| Rafter strength | 50% | 77% | 83% |
| Post utilisation | 10% | 16% | 17% |
| Utilisation | 95% | 91% | 75% |
| Depth vs frost depth | ok | ok | ok |
| Checks overall | with a caution | with a caution | with a caution |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 990 mm, 10 frames. Purlin C-channel 41×41×2.5: strength 82%, deflection 81% of L/200 (snow on panel 489 Pa).Chernihiv: Frame spacing 2 230 mm, 9 frames. Purlin C-channel 60×40×2: strength 85%, deflection 74% of L/200 (snow on panel 1 106 Pa).
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 900: 0.087 m³ of concrete per post. Wind uplift on the front post ≈ 8.8 kN (with γ=1.5) vs ≈ 9.3 kN (concrete weight + soil friction, estimate) → 95%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.6 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 91%.
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 691, cantilever 612 mm → strength 83%.
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,093 | 9 |
| П2 | Rear post | Tube 60×60×2 | 2,939 | 9 |
| Кр1 | Rafter (inclined beam) | C-channel 60×40×2 | 2,916 | 9 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,406 | 9 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,543 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р7 | Purlin (rail) | C-channel 60×40×2 | 495 | 2 |
| Р8 | Purlin (rail) | C-channel 60×40×2 | 495 | 2 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 50 |
| — | Bolt M10×80 set · purlin to rafter | — | — | 36 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 9 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 36 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 9 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 30 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 56 |
| — | Bolt M8×50 + channel nut | — | — | 64 |
| — | Concrete for 18 posts, Ø300×1100 | — | — | 1.54 m³ |
Profile cutting
30 bars of 6,000 mm, 168.3 m of profile in total.
- Tube 60×60×29 bars
- C-channel 60×40×221 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 63,303₴
- With installation and delivery
- 99,585₴
- Per 1 kW
- 7,063UAH/kW
The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 16,057 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.