Section of the table from the Solispec engine (median zone — Cherkasy)

REC

Ground frame for 20 REC Alpha Pure-RX REC470AA Pure-RX (HJT) panels (2×10)

2 rows of 10 panels, 9.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
9.40kW
Steel
332.1kg
Posts
12
Bolts
146
Materials
44,584₴
Yield
10,705kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the REC Alpha Pure-RX REC470AA Pure-RX (HJT) panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,330 mm6 frames, pitch up to 2,330 mm6 frames, pitch up to 2,330 mm
Posts121212
Footings (bored concrete)12 pcs, Ø400 mm, depth 900 mm12 pcs, Ø300 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.49 m³1.03 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,814 mm600 / 1,814 mm600 / 1,814 mm
Panel field size12,370 × 2,282 mm12,370 × 2,282 mm12,370 × 2,282 mm
Row spacing between tables (no shade on 21 December)7,800 mm at noon · 8,770 mm ±2 h8,640 mm at noon · 9,980 mm ±2 h9,470 mm at noon · 11,260 mm ±2 h
Steel323.5 kg332.1 kg340.8 kg
BoltsM10 — 102, M8 — 44M10 — 102, M8 — 44M10 — 102, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials44,855 UAH44,584 UAH45,520 UAH
With installation and delivery69,515 UAH69,244 UAH70,180 UAH
Per 1 kW7,395 UAH/kW7,366 UAH/kW7,466 UAH/kW
Yield1,266 kWh/kW · 11,904 kWh/year1,139 kWh/kW · 10,705 kWh/year1,043 kWh/kW · 9,805 kWh/year
Strength σ/fy63%86%93%
Deflection / (L/200)57%79%85%
Rafter strength58%80%87%
Post utilisation12%16%18%
Utilisation94%95%79%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 10.3 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 94%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.0 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 95%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 330 mm, 6 frames. Purlin C-channel 60×40×2: strength 86%, deflection 79% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 330 mm, 6 frames. Purlin C-channel 60×40×2: strength 93%, deflection 85% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 691, cantilever 612 mm → strength 80%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 691, cantilever 612 mm → strength 87%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0936
П2Rear postTube 60×60×22,9396
Кр1Rafter (inclined beam)C-channel 60×40×22,9166
Пк1Frame strutC-channel 60×40×21,4066
Х1Longitudinal brace (cross)C-channel 60×40×22,6334
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×23702
Р6Purlin (rail)C-channel 60×40×23702
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——24
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×130 set · post–rafter — through spacer inserts——24
—Bolt M10×140 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×50 + channel nut——44
—Concrete for 12 posts, Ø300×1100——1.03 m³

Profile cutting

21 bars of 6,000 mm, 116.1 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 60×40×215 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
44,584₴
With installation and delivery
69,244₴
Per 1 kW
7,366UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 10,705 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel