Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 40 Jinko Tiger Neo JKM590N-72HL4-V panels (4×10)

4 rows of 10 panels, 23.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
23.60kW
Steel
1,401.6kg
Posts
24
Bolts
306
Materials
178,176₴
Yield
26,875kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM590N-72HL4-V panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 80×80×3Tube 80×80×3Tube 80×80×3
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 41×41×2.5
Frames9 frames, pitch up to 1,400 mm8 frames, pitch up to 1,600 mm9 frames, pitch up to 1,400 mm
Posts272427
Footings (bored concrete)27 pcs, Ø500 mm, depth 1,500 mm24 pcs, Ø500 mm, depth 1,500 mm27 pcs, Ø400 mm, depth 1,500 mm
Concrete8.75 m³7.78 m³5.60 m³
Tilt30°30°30°
Panel bottom / post top600 / 4,297 mm600 / 4,280 mm600 / 4,297 mm
Panel field size11,660 × 6,585 mm11,660 × 6,594 mm11,660 × 6,585 mm
Row spacing between tables (no shade on 21 December)20,580 mm at noon · 23,130 mm ±2 h22,800 mm at noon · 26,330 mm ±2 h24,990 mm at noon · 29,700 mm ±2 h
Steel1,544.5 kg1,401.6 kg1,544.5 kg
BoltsM10 — 240, M8 — 88M10 — 218, M8 — 88M10 — 240, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials192,004 UAH178,176 UAH179,863 UAH
With installation and delivery251,658 UAH237,868 UAH239,517 UAH
Per 1 kW10,663 UAH/kW10,079 UAH/kW10,149 UAH/kW
Yield1,266 kWh/kW · 29,888 kWh/year1,139 kWh/kW · 26,875 kWh/year1,043 kWh/kW · 24,618 kWh/year
Strength σ/fy61%58%86%
Deflection / (L/200)42%37%59%
Rafter strength54%81%76%
Post utilisation22%33%31%
Post utilisation П37%10%10%
Utilisation88%88%99%
Depth vs frost depthokokok
Bolt utilisation33%50%47%
Plate section5%8%7%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 21.1 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 21.1 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 88%.Chernihiv: Foundation Ø400 × 1 500: 0.188 m³ of concrete per post. Wind uplift on the front post ≈ 18.0 kN (with γ=1.5) vs ≈ 18.2 kN (concrete weight + soil friction, estimate) → 99%.
  • Stock length, mmKherson: Rafter 8 352 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 460, Кр1б 4 892 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 460 mm from the lower end of the rafter, where the moment is small. Bolt: 5.99 kN vs 18.00 kN (33%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 8 352 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 460, Кр1б 4 892 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 460 mm from the lower end of the rafter, where the moment is small. Bolt: 9.02 kN vs 18.00 kN (50%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 8 352 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 460, Кр1б 4 892 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 460 mm from the lower end of the rafter, where the moment is small. Bolt: 8.43 kN vs 18.00 kN (47%), plate 7%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter · C-channel 100×50×2.5 · 3 posts, spans between posts 2 965 mm, cantilever 1 211 mm — continuous beam on 3 supports → strength 81%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 400 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 86%, deflection 59% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 80×80×32,8408
П2Rear postTube 80×80×35,8058
П3Middle postTube 80×80×34,3238
Кр1аRafter (inclined beam)C-channel 100×50×2.53,4608
Кр1бRafter (inclined beam)C-channel 100×50×2.54,8928
Н1Rafter splice plateC-channel 100×50×2.53008
Пк1Frame strutC-channel 60×40×23,5818
Пк2Front frame strutC-channel 60×40×22,2668
Х1Longitudinal brace (cross)C-channel 60×40×23,9714
Р1Purlin (rail)C-channel 60×40×26,0004
Р2Purlin (rail)C-channel 60×40×26,0004
Р3Purlin (rail)C-channel 60×40×25,6604
Р4Purlin (rail)C-channel 60×40×25,6604
—Bolt M10×100 / M10×25 set · frame and struts / purlins, braces, connectors——42
—Bolt M10×120 set · purlin to rafter——64
—Bolt M10×140 set · strut to post——8
—Bolt M10×150 set · post–rafter, strut to rafter — through spacer inserts——56
—Bolt M10×160 set · brace to post — through spacer inserts——8
—Bolt M10×200 set · strut to rafter — through spacer inserts——8
—Bolt M10×25 set · rafter splice (plate Н1)——32
—End clamp 30 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 24 posts, Ø500×1500——7.78 m³

Profile cutting

64 bars of 6,000 mm, 328.9 m of profile in total.

  • Tube 80×80×320 bars
  • C-channel 100×50×2.516 bars
  • C-channel 60×40×228 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
178,176₴
With installation and delivery
237,868₴
Per 1 kW
10,079UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 26 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 80×80×3, stock length 6 000 mm20 bar42050,400
C-channel 100×50×2.5, stock length 6 000 mm16 bar38036,480
C-channel 60×40×2, stock length 6 000 mm28 bar23038,640
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×100 cl. 8.8 set — frame, struts8 pcs22176
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors34 pcs22748
Bolt M10×120 cl. 8.8 set — purlin to rafter86 pcs272,322
Bolt M10×140 cl. 8.8 set — strut to post8 pcs27216
Bolt M10×150 cl. 8.8 set — post–rafter, strut to rafter — through spacer inserts56 pcs271,512
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
Bolt M10×200 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 30 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)24 pcs20480
Borehole casing (roofing felt / PVC, 300 mm)24 pcs601,440
Crushed stone 20–40 for the bottom of the boreholes0.47 m³900423
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts7.78 m³3,80029,564
Rebar Ø10 (4 bars per post)164 m284,592
Spacer inserts / packs — pieces of the same profile (from offcuts): 16 × 80 mm, 4 × 61 mm, 4 × 20 mm24 pcs00
Materials178,176

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 26,875 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 4×10 layout with other panels

Next