Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 16 Jinko Tiger Neo JKM590N-72HL4-V panels (2×8)

2 rows of 8 panels, 9.44 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
9.44kW
Steel
360.7kg
Posts
14
Bolts
132
Materials
45,977₴
Yield
10,750kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM590N-72HL4-V panel and the 2 × 8 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 1,760 mm7 frames, pitch up to 1,480 mm6 frames, pitch up to 1,760 mm
Posts121412
Footings (bored concrete)12 pcs, Ø350 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.40 m³1.20 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,211 mm600 / 2,211 mm600 / 2,202 mm
Panel field size9,352 × 2,970 mm9,352 × 2,970 mm9,352 × 2,975 mm
Row spacing between tables (no shade on 21 December)10,270 mm at noon · 11,540 mm ±2 h11,380 mm at noon · 13,140 mm ±2 h12,470 mm at noon · 14,820 mm ±2 h
Steel328.4 kg360.7 kg334.2 kg
BoltsM10 — 86, M8 — 36M10 — 96, M8 — 36M10 — 86, M8 — 36
Panel clampsend 8, middle 28end 8, middle 28end 8, middle 28
Materials43,308 UAH45,977 UAH46,642 UAH
With installation and delivery68,045 UAH70,659 UAH71,379 UAH
Per 1 kW7,208 UAH/kW7,485 UAH/kW7,561 UAH/kW
Yield1,266 kWh/kW · 11,955 kWh/year1,139 kWh/kW · 10,750 kWh/year1,043 kWh/kW · 9,847 kWh/year
Strength σ/fy49%47%71%
Deflection / (L/200)34%27%49%
Rafter strength76%87%75%
Post utilisation15%17%22%
Utilisation97%86%84%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.0 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 97%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.1 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 86%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.4 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 84%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 2 178, cantilever 789 mm → strength 87%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2467
П2Rear postTube 60×60×23,3367
Кр1Rafter (inclined beam)C-channel 60×40×23,7567
Пк1Frame strutC-channel 60×40×21,7517
Х1Longitudinal brace (cross)C-channel 60×40×22,1654
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×23,3522
Р4Purlin (rail)C-channel 60×40×23,3522
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——28
—Bolt M8×50 + channel nut——36
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

22 bars of 6,000 mm, 123.7 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×215 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
45,977₴
With installation and delivery
70,659₴
Per 1 kW
7,485UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 10,750 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×8 layout with other panels

Next