Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 40 Maxeon 3 SPR-MAX3-430-R (IBC) panels (4×10)

4 rows of 10 panels, 17.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.20kW
Steel
819.5kg
Posts
16
Bolts
290
Materials
109,245₴
Yield
19,587kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 3 SPR-MAX3-430-R (IBC) panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 80×80×3
RaftersC-channel 100×50×2.5C-channel 100×50×2.5Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames7 frames, pitch up to 1,710 mm8 frames, pitch up to 1,480 mm8 frames, pitch up to 1,480 mm
Posts141624
Footings (bored concrete)14 pcs, Ø450 mm, depth 1,500 mm16 pcs, Ø400 mm, depth 1,300 mm24 pcs, Ø350 mm, depth 1,500 mm
Concrete3.67 m³2.88 m³3.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,321 mm600 / 3,321 mm600 / 3,557 mm
Panel field size10,780 × 4,895 mm10,780 × 4,895 mm10,780 × 5,263 mm
Row spacing between tables (no shade on 21 December)16,400 mm at noon · 18,430 mm ±2 h18,170 mm at noon · 20,980 mm ±2 h19,910 mm at noon · 23,670 mm ±2 h
Steel760.4 kg819.5 kg1,214.3 kg
BoltsM10 — 182, M8 — 88M10 — 202, M8 — 88M10 — 218, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials106,726 UAH109,245 UAH130,729 UAH
With installation and delivery150,556 UAH153,012 UAH175,211 UAH
Per 1 kW8,753 UAH/kW8,896 UAH/kW10,187 UAH/kW
Yield1,266 kWh/kW · 21,783 kWh/year1,139 kWh/kW · 19,587 kWh/year1,043 kWh/kW · 17,942 kWh/year
Strength σ/fy70%70%75%
Deflection / (L/200)59%51%55%
Rafter strength86%99%96%
Post utilisation42%49%19%
Utilisation92%93%92%
Depth vs frost depthokokok
Bolt utilisation74%86%20%
Plate section14%16%1%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3——7%
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 891, cantilever 1 409 mm → strength 86%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 891, cantilever 1 409 mm → strength 99%.Chernihiv: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 382 mm, cantilever 972 mm — continuous beam on 3 supports → strength 96%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 19.4 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 92%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.7 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 93%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.3 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 92%.
  • Stock length, mmKherson: Rafter 6 708 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 2 140, Кр1б 4 568 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 2 140 mm from the lower end of the rafter, where the moment is small. Bolt: 13.40 kN vs 18.00 kN (74%), plate 14%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 708 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 2 140, Кр1б 4 568 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 2 140 mm from the lower end of the rafter, where the moment is small. Bolt: 15.44 kN vs 18.00 kN (86%), plate 16%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 708 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 480, Кр1б 5 228 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 480 mm from the lower end of the rafter, where the moment is small. Bolt: 4.38 kN vs 22.27 kN (20%), plate 1%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,7018
П2Rear postTube 60×60×24,6468
Кр1аRafter (inclined beam)C-channel 100×50×2.52,1408
Кр1бRafter (inclined beam)C-channel 100×50×2.54,5688
Н1Rafter splice plateC-channel 100×50×2.53008
Пк1Frame strutC-channel 41×41×2.52,7418
Пк2Front frame strutC-channel 41×41×2.53,6658
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0604
Р1Purlin (rail)C-channel 41×41×2.56,0004
Р2Purlin (rail)C-channel 41×41×2.56,0004
Р3Purlin (rail)C-channel 41×41×2.54,7804
Р4Purlin (rail)C-channel 41×41×2.54,7804
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——40
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——64
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——40
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——32
—End clamp 40 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×60 + channel nut——88
—Concrete for 16 posts, Ø400×1300——2.88 m³

Profile cutting

54 bars of 6,000 mm, 264.6 m of profile in total.

  • Tube 60×60×212 bars
  • C-channel 100×50×2.512 bars
  • C-channel 41×41×2.530 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
109,245₴
With installation and delivery
153,012₴
Per 1 kW
8,896UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 100×50×2.5, stock length 6 000 mm12 bar38027,360
C-channel 41×41×2.5, stock length 6 000 mm30 bar20036,000
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×80 cl. 8.8 set — frame, struts8 pcs22176
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors32 pcs22704
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts8 pcs27216
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter85 pcs272,295
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts40 pcs271,080
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 40 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×60 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.20 m³900180
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow32 m351,120
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts2.88 m³3,80010,944
Rebar Ø10 (4 bars per post)96 m282,688
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 8 × 50 mm, 4 × 30 mm, 8 × 10 mm32 pcs00
Materials109,245

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 19,587 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.