Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 16 Maxeon 3 SPR-MAX3-430-R (IBC) panels (2×8)

2 rows of 8 panels, 6.88 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
6.88kW
Steel
265.3kg
Posts
10
Bolts
112
Materials
36,321₴
Yield
7,835kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 3 SPR-MAX3-430-R (IBC) panel and the 2 × 8 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 2,620 mm5 frames, pitch up to 2,010 mm5 frames, pitch up to 2,010 mm
Posts81010
Footings (bored concrete)8 pcs, Ø400 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.22 m³0.86 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,874 mm600 / 1,874 mm600 / 1,874 mm
Panel field size8,648 × 2,387 mm8,648 × 2,387 mm8,648 × 2,387 mm
Row spacing between tables (no shade on 21 December)8,180 mm at noon · 9,190 mm ±2 h9,060 mm at noon · 10,470 mm ±2 h9,930 mm at noon · 11,800 mm ±2 h
Steel240.8 kg265.3 kg272.5 kg
BoltsM10 — 66, M8 — 36M10 — 76, M8 — 36M10 — 76, M8 — 36
Panel clampsend 8, middle 28end 8, middle 28end 8, middle 28
Materials33,884 UAH36,321 UAH37,115 UAH
With installation and delivery52,366 UAH54,691 UAH55,485 UAH
Per 1 kW7,611 UAH/kW7,949 UAH/kW8,065 UAH/kW
Yield1,266 kWh/kW · 8,713 kWh/year1,139 kWh/kW · 7,835 kWh/year1,043 kWh/kW · 7,177 kWh/year
Strength σ/fy84%68%73%
Deflection / (L/200)86%53%57%
Rafter strength72%76%82%
Post utilisation15%15%16%
Utilisation92%87%72%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 620 mm, 4 frames. Purlin C-channel 60×40×2: strength 84%, deflection 86% of L/200 (snow on panel 489 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.3 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 92%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.3 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 87%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 766, cantilever 639 mm → strength 82%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1175
П2Rear postTube 60×60×22,9995
Кр1Rafter (inclined beam)C-channel 60×40×23,0445
Пк1Frame strutC-channel 60×40×21,4595
Х1Longitudinal brace (cross)C-channel 60×40×22,3784
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×22,6482
Р4Purlin (rail)C-channel 60×40×22,6482
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——20
—Bolt M10×90 set · strut to post — through spacer inserts——5
—Bolt M10×130 set · post–rafter — through spacer inserts——20
—Bolt M10×140 set · strut to rafter — through spacer inserts——5
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 40 mm——8
—Mid clamp (30–40 mm)——28
—Bolt M8×60 + channel nut——36
—Concrete for 10 posts, Ø300×1100——0.86 m³

Profile cutting

17 bars of 6,000 mm, 92.2 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×212 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
36,321₴
With installation and delivery
54,691₴
Per 1 kW
7,949UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 7,835 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.