Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 60 Maxeon 3 SPR-MAX3-430-R (IBC) panels (3×20)

3 rows of 20 panels, 25.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
25.80kW
Steel
964.9kg
Posts
22
Bolts
362
Materials
134,962₴
Yield
29,381kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 3 SPR-MAX3-430-R (IBC) panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 80×40×2C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames15 frames, pitch up to 1,500 mm11 frames, pitch up to 2,080 mm10 frames, pitch up to 2,310 mm
Posts302220
Footings (bored concrete)30 pcs, Ø400 mm, depth 1,100 mm22 pcs, Ø400 mm, depth 1,300 mm20 pcs, Ø400 mm, depth 1,300 mm
Concrete4.56 m³3.95 m³3.59 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,606 mm600 / 2,581 mm600 / 2,581 mm
Panel field size21,440 × 3,636 mm21,440 × 3,651 mm21,440 × 3,651 mm
Row spacing between tables (no shade on 21 December)12,290 mm at noon · 13,810 mm ±2 h13,610 mm at noon · 15,720 mm ±2 h14,920 mm at noon · 17,730 mm ±2 h
Steel1,059.6 kg964.9 kg912.1 kg
BoltsM10 — 292, M8 — 126M10 — 236, M8 — 126M10 — 222, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials145,306 UAH134,962 UAH126,076 UAH
With installation and delivery210,131 UAH200,207 UAH191,386 UAH
Per 1 kW8,145 UAH/kW7,760 UAH/kW7,418 UAH/kW
Yield1,266 kWh/kW · 32,674 kWh/year1,139 kWh/kW · 29,381 kWh/year1,043 kWh/kW · 26,913 kWh/year
Strength σ/fy52%75%99%
Deflection / (L/200)38%61%90%
Rafter strength75%72%86%
Post utilisation19%35%42%
Utilisation88%91%98%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.3 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 91%.Chernihiv: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.5 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 98%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 2 310 mm, 10 frames. Purlin C-channel 60×40×2: strength 99%, deflection 90% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 2 828, cantilever 1 024 mm → strength 86%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,49211
П2Rear postTube 60×60×23,90611
Кр1Rafter (inclined beam)C-channel 100×50×2.54,87611
Пк1Frame strutC-channel 60×40×22,08411
Пк2Front frame strutC-channel 60×40×22,74911
Х1Longitudinal brace (cross)C-channel 60×40×22,8544
Р1Purlin (rail)C-channel 60×40×26,0003
Р2Purlin (rail)C-channel 60×40×26,0003
Р3Purlin (rail)C-channel 60×40×26,0003
Р4Purlin (rail)C-channel 60×40×26,0003
Р5Purlin (rail)C-channel 60×40×26,0003
Р6Purlin (rail)C-channel 60×40×26,0003
Р7Purlin (rail)C-channel 60×40×23,4403
Р8Purlin (rail)C-channel 60×40×23,4403
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——85
—Bolt M10×90 set · strut to post — through spacer inserts——11
—Bolt M10×120 set · purlin to rafter——66
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——55
—Bolt M10×140 set · strut to rafter — through spacer inserts——11
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 40 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×60 + channel nut——126
—Concrete for 22 posts, Ø400×1300——3.95 m³

Profile cutting

62 bars of 6,000 mm, 317.2 m of profile in total.

  • Tube 60×60×217 bars
  • C-channel 100×50×2.511 bars
  • C-channel 60×40×234 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
134,962₴
With installation and delivery
200,207₴
Per 1 kW
7,760UAH/kW

The engine's estimate has 25 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 29,381 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 3×20 layout with other panels

Next