Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 60 Jinko Tiger Neo JKM485N-60HL4-V panels (3×20)

3 rows of 20 panels, 29.10 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
29.10kW
Steel
1,185.5kg
Posts
28
Bolts
404
Materials
150,658₴
Yield
33,139kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM485N-60HL4-V panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 60×40×2
Frames17 frames, pitch up to 1,420 mm14 frames, pitch up to 1,740 mm11 frames, pitch up to 2,250 mm
Posts342822
Footings (bored concrete)34 pcs, Ø400 mm, depth 1,100 mm28 pcs, Ø350 mm, depth 1,300 mm22 pcs, Ø400 mm, depth 1,500 mm
Concrete5.17 m³3.85 m³4.56 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,720 mm600 / 2,703 mm600 / 2,686 mm
Panel field size23,200 × 3,814 mm23,200 × 3,824 mm23,200 × 3,834 mm
Row spacing between tables (no shade on 21 December)12,920 mm at noon · 14,520 mm ±2 h14,320 mm at noon · 16,530 mm ±2 h15,690 mm at noon · 18,650 mm ±2 h
Steel1,306.7 kg1,185.5 kg1,032.4 kg
BoltsM10 — 320, M8 — 126M10 — 278, M8 — 126M10 — 236, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials156,547 UAH150,658 UAH141,994 UAH
With installation and delivery230,694 UAH223,830 UAH215,489 UAH
Per 1 kW7,928 UAH/kW7,692 UAH/kW7,405 UAH/kW
Yield1,266 kWh/kW · 36,853 kWh/year1,139 kWh/kW · 33,139 kWh/year1,043 kWh/kW · 30,355 kWh/year
Strength σ/fy49%99%99%
Deflection / (L/200)35%85%88%
Rafter strength76%67%92%
Post utilisation20%33%45%
Utilisation89%95%88%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.9 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 12.7 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 95%.Chernihiv: Foundation Ø400 × 1 500: 0.188 m³ of concrete per post. Wind uplift on the front post ≈ 16.1 kN (with γ=1.5) vs ≈ 18.2 kN (concrete weight + soil friction, estimate) → 88%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 740 mm, 14 frames. Purlin C-channel 41×41×2.5: strength 99%, deflection 85% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 99%, deflection 88% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 2 968, cantilever 1 075 mm → strength 92%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,54414
П2Rear postTube 60×60×24,02814
Кр1Rafter (inclined beam)C-channel 100×50×2.55,11814
Пк1Frame strutC-channel 41×41×2.52,19014
Пк2Front frame strutC-channel 41×41×2.52,88714
Х1Longitudinal brace (cross)C-channel 41×41×2.52,7034
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.55,2003
Р8Purlin (rail)C-channel 41×41×2.55,2003
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——86
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——14
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——84
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——70
—Bolt M10×140 set · strut to rafter — through spacer inserts——14
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 28 posts, Ø350×1300——3.85 m³

Profile cutting

75 bars of 6,000 mm, 384.8 m of profile in total.

  • Tube 60×60×221 bars
  • C-channel 100×50×2.514 bars
  • C-channel 41×41×2.540 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
150,658₴
With installation and delivery
223,830₴
Per 1 kW
7,692UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 27 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm21 bar21026,460
C-channel 100×50×2.5, stock length 6 000 mm14 bar38031,920
C-channel 41×41×2.5, stock length 6 000 mm40 bar20048,000
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×80 cl. 8.8 set — frame, struts14 pcs22308
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors72 pcs221,584
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts14 pcs27378
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter112 pcs273,024
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts70 pcs271,890
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts14 pcs27378
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)28 pcs20560
Borehole casing (roofing felt / PVC, 300 mm)28 pcs601,680
Crushed stone 20–40 for the bottom of the boreholes0.27 m³900243
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow57 m351,995
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml4 pcs3501,400
Concrete M200 for posts3.85 m³3,80014,630
Rebar Ø10 (4 bars per post)168 m284,704
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 14 × 70 mm, 14 × 50 mm, 4 × 30 mm, 14 × 10 mm50 pcs00
Materials150,658

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 33,139 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.