Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 30 Jinko Tiger Neo JKM485N-60HL4-V panels (3×10)

3 rows of 10 panels, 14.55 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
14.55kW
Steel
607.1kg
Posts
14
Bolts
198
Materials
83,832₴
Yield
16,569kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM485N-60HL4-V panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 80×40×2C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames9 frames, pitch up to 1,400 mm7 frames, pitch up to 1,850 mm6 frames, pitch up to 2,200 mm
Posts181412
Footings (bored concrete)18 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø400 mm, depth 1,300 mm12 pcs, Ø400 mm, depth 1,300 mm
Concrete2.74 m³2.52 m³2.16 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,711 mm600 / 2,686 mm600 / 2,686 mm
Panel field size11,660 × 3,819 mm11,660 × 3,834 mm11,660 × 3,834 mm
Row spacing between tables (no shade on 21 December)12,920 mm at noon · 14,520 mm ±2 h14,320 mm at noon · 16,530 mm ±2 h15,690 mm at noon · 18,650 mm ±2 h
Steel642.7 kg607.1 kg553.0 kg
BoltsM10 — 160, M8 — 66M10 — 132, M8 — 66M10 — 118, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials87,093 UAH83,832 UAH75,264 UAH
With installation and delivery124,275 UAH121,142 UAH112,649 UAH
Per 1 kW8,541 UAH/kW8,326 UAH/kW7,742 UAH/kW
Yield1,266 kWh/kW · 18,427 kWh/year1,139 kWh/kW · 16,569 kWh/year1,043 kWh/kW · 15,178 kWh/year
Strength σ/fy48%63%95%
Deflection / (L/200)33%45%82%
Rafter strength78%71%90%
Post utilisation20%35%44%
Utilisation88%86%100%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.7 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 13.5 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 86%.Chernihiv: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.7 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 100%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 95%, deflection 82% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 2 968, cantilever 1 075 mm → strength 90%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,5277
П2Rear postTube 60×60×24,0117
Кр1Rafter (inclined beam)C-channel 100×50×2.55,1187
Пк1Frame strutC-channel 60×40×22,1777
Пк2Front frame strutC-channel 60×40×22,8757
Х1Longitudinal brace (cross)C-channel 60×40×22,7644
Р1Purlin (rail)C-channel 60×40×26,0003
Р2Purlin (rail)C-channel 60×40×26,0003
Р3Purlin (rail)C-channel 60×40×25,6603
Р4Purlin (rail)C-channel 60×40×25,6603
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——33
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×120 set · purlin to rafter——42
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——35
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 14 posts, Ø400×1300——2.52 m³

Profile cutting

39 bars of 6,000 mm, 198.0 m of profile in total.

  • Tube 60×60×211 bars
  • C-channel 100×50×2.57 bars
  • C-channel 60×40×221 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
83,832₴
With installation and delivery
121,142₴
Per 1 kW
8,326UAH/kW

The engine's estimate has 25 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 16,569 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.