Ground frame for 24 Jinko Tiger Neo JKM485N-60HL4-V panels (2×12)

2 rows of 12 panels, 11.64 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
11.64kW
Steel
399.3kg
Posts
14
Bolts
164
Materials
53,151₴
Yield
13,255kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM485N-60HL4-V panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,640 mm7 frames, pitch up to 2,220 mm7 frames, pitch up to 2,220 mm
Posts121414
Footings (bored concrete)12 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete1.83 m³1.42 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,943 mm600 / 1,943 mm600 / 1,943 mm
Panel field size13,968 × 2,506 mm13,968 × 2,506 mm13,968 × 2,506 mm
Row spacing between tables (no shade on 21 December)8,600 mm at noon · 9,670 mm ±2 h9,530 mm at noon · 11,010 mm ±2 h10,440 mm at noon · 12,410 mm ±2 h
Steel362.1 kg399.3 kg399.3 kg
BoltsM10 — 102, M8 — 52M10 — 112, M8 — 52M10 — 112, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials52,346 UAH53,151 UAH53,151 UAH
With installation and delivery82,606 UAH83,361 UAH83,361 UAH
Per 1 kW7,097 UAH/kW7,162 UAH/kW7,162 UAH/kW
Yield1,266 kWh/kW · 14,741 kWh/year1,139 kWh/kW · 13,255 kWh/year1,043 kWh/kW · 12,142 kWh/year
Strength σ/fy90%87%94%
Deflection / (L/200)93%76%82%
Rafter strength80%92%99%
Post utilisation16%18%20%
Utilisation99%87%85%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 640 mm, 6 frames. Purlin C-channel 60×40×2: strength 90%, deflection 93% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 87%, deflection 76% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 94%, deflection 82% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 1 851, cantilever 670 mm → strength 80%.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 851, cantilever 670 mm → strength 92%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 851, cantilever 670 mm → strength 99%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.2 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.7 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.5 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 85%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,3427
П2Rear postTube 60×60×23,2687
Кр1Rafter (inclined beam)C-channel 60×40×23,1927
Пк1Frame strutC-channel 60×40×21,5187
Х1Longitudinal brace (cross)C-channel 60×40×22,5944
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×21,9682
Р6Purlin (rail)C-channel 60×40×21,9682
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 14 posts, Ø300×1300——1.42 m³

Profile cutting

25 bars of 6,000 mm, 138.5 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×218 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
53,151₴
With installation and delivery
83,361₴
Per 1 kW
7,162UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 13,255 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.