Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 40 Maxeon 3 SPR-MAX3-430-R (IBC) panels (2×20)

2 rows of 20 panels, 17.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.20kW
Steel
566.1kg
Posts
20
Bolts
242
Materials
76,299₴
Yield
19,587kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 3 SPR-MAX3-430-R (IBC) panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames11 frames, pitch up to 2,080 mm10 frames, pitch up to 2,310 mm10 frames, pitch up to 2,310 mm
Posts222020
Footings (bored concrete)22 pcs, Ø400 mm, depth 900 mm20 pcs, Ø300 mm, depth 1,300 mm20 pcs, Ø300 mm, depth 1,300 mm
Concrete2.74 m³2.02 m³2.02 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,891 mm600 / 1,874 mm600 / 1,874 mm
Panel field size21,440 × 2,378 mm21,440 × 2,387 mm21,440 × 2,387 mm
Row spacing between tables (no shade on 21 December)8,180 mm at noon · 9,190 mm ±2 h9,060 mm at noon · 10,470 mm ±2 h9,930 mm at noon · 11,800 mm ±2 h
Steel599.1 kg566.1 kg566.1 kg
BoltsM10 — 168, M8 — 84M10 — 158, M8 — 84M10 — 158, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials71,764 UAH76,299 UAH76,299 UAH
With installation and delivery116,191 UAH120,259 UAH120,259 UAH
Per 1 kW6,755 UAH/kW6,992 UAH/kW6,992 UAH/kW
Yield1,266 kWh/kW · 21,783 kWh/year1,139 kWh/kW · 19,587 kWh/year1,043 kWh/kW · 17,942 kWh/year
Strength σ/fy95%89%96%
Deflection / (L/200)97%81%87%
Rafter strength37%87%94%
Post utilisation12%18%19%
Utilisation89%85%83%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 080 mm, 11 frames. Purlin C-channel 41×41×2.5: strength 95%, deflection 97% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 310 mm, 10 frames. Purlin C-channel 60×40×2: strength 89%, deflection 81% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 310 mm, 10 frames. Purlin C-channel 60×40×2: strength 96%, deflection 87% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 9.8 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.5 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 85%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.3 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 83%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 766, cantilever 639 mm → strength 87%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 766, cantilever 639 mm → strength 94%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,31710
П2Rear postTube 60×60×23,19910
Кр1Rafter (inclined beam)C-channel 60×40×23,04410
Пк1Frame strutC-channel 60×40×21,45910
Х1Longitudinal brace (cross)C-channel 60×40×22,6414
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×23,4402
Р8Purlin (rail)C-channel 60×40×23,4402
—Bolt M10×25 set · purlins, braces, connectors——50
—Bolt M10×80 set · purlin to rafter——40
—Bolt M10×90 set · strut to post — through spacer inserts——10
—Bolt M10×120 set · post–rafter——40
—Bolt M10×130 set · strut to rafter — through spacer inserts——10
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 40 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×60 + channel nut——84
—Concrete for 20 posts, Ø300×1300——2.02 m³

Profile cutting

36 bars of 6,000 mm, 196.5 m of profile in total.

  • Tube 60×60×210 bars
  • C-channel 60×40×226 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
76,299₴
With installation and delivery
120,259₴
Per 1 kW
6,992UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm10 bar21012,600
C-channel 60×40×2, stock length 6 000 mm26 bar23035,880
C-channel connector (splice plate L 300)12 pcs901,080
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors66 pcs221,452
Bolt M10×80 cl. 8.8 set — purlin to rafter40 pcs271,080
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts10 pcs27270
Bolt M10×120 cl. 8.8 set — post–rafter40 pcs271,080
Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts10 pcs27270
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
End clamp 40 mm8 pcs35280
Mid clamp (30–40 mm)76 pcs322,432
Bolt M8×60 A2 + spring channel nut M893 pcs141,302
Post base anchor pin (M10 / rebar Ø12)20 pcs20400
Borehole casing (roofing felt / PVC, 300 mm)20 pcs601,200
Crushed stone 20–40 for the bottom of the boreholes0.14 m³900126
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow47 m351,645
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts2.02 m³3,8007,676
Rebar Ø10 (4 bars per post)120 m283,360
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 10 × 70 mm, 4 × 30 mm, 10 × 10 mm28 pcs00
Materials76,299

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 19,587 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.