Section of the table from the Solispec engine (median zone — Cherkasy)

SunPower/Maxeon

Ground frame for 30 Maxeon 3 SPR-MAX3-430-R (IBC) panels (2×15)

2 rows of 15 panels, 12.90 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
12.90kW
Steel
467.9kg
Posts
16
Bolts
186
Materials
57,973₴
Yield
14,690kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Maxeon 3 SPR-MAX3-430-R (IBC) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2C-channel 60×40×2
Purlins and bracesC-channel 41×41×2.5C-channel 41×62×2C-channel 60×40×2
Frames9 frames, pitch up to 1,940 mm8 frames, pitch up to 2,210 mm8 frames, pitch up to 2,210 mm
Posts181616
Footings (bored concrete)18 pcs, Ø350 mm, depth 900 mm16 pcs, Ø300 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,300 mm
Concrete1.71 m³1.37 m³1.62 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,891 mm600 / 1,873 mm600 / 1,874 mm
Panel field size16,110 × 2,378 mm16,110 × 2,388 mm16,110 × 2,387 mm
Row spacing between tables (no shade on 21 December)8,180 mm at noon · 9,190 mm ±2 h9,060 mm at noon · 10,470 mm ±2 h9,930 mm at noon · 11,800 mm ±2 h
Steel478.7 kg467.9 kg446.6 kg
BoltsM10 — 132, M8 — 64M10 — 122, M8 — 64M10 — 122, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials56,384 UAH57,973 UAH59,679 UAH
With installation and delivery90,049 UAH91,643 UAH92,989 UAH
Per 1 kW6,981 UAH/kW7,104 UAH/kW7,208 UAH/kW
Yield1,266 kWh/kW · 16,337 kWh/year1,139 kWh/kW · 14,690 kWh/year1,043 kWh/kW · 13,456 kWh/year
Strength σ/fy82%85%88%
Deflection / (L/200)79%71%76%
Rafter strength35%54%90%
Post utilisation11%17%18%
Utilisation98%96%79%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 940 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 82%, deflection 79% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 210 mm, 8 frames. Purlin C-channel 41×62×2: strength 85%, deflection 71% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 210 mm, 8 frames. Purlin C-channel 60×40×2: strength 88%, deflection 76% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 900: 0.087 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 9.3 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 96%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 766, cantilever 639 mm → strength 90%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1158
П2Rear postTube 60×60×22,9988
Кр1Rafter (inclined beam)Tube 60×60×23,0448
Пк1Frame strutC-channel 41×62×21,4578
Х1Longitudinal brace (cross)C-channel 41×62×22,5524
Р1Purlin (rail)C-channel 41×62×26,0002
Р2Purlin (rail)C-channel 41×62×26,0002
Р3Purlin (rail)C-channel 41×62×26,0002
Р4Purlin (rail)C-channel 41×62×26,0002
Р5Purlin (rail)C-channel 41×62×24,1102
Р6Purlin (rail)C-channel 41×62×24,1102
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——106
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——12
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 40 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×60 + channel nut——64
—Concrete for 16 posts, Ø300×1100——1.37 m³

Profile cutting

27 bars of 6,000 mm, 151.6 m of profile in total.

  • Tube 60×60×212 bars
  • C-channel 41×62×215 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
57,973₴
With installation and delivery
91,643₴
Per 1 kW
7,104UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 21 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 41×62×2, stock length 6 000 mm15 bar25022,500
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×140 cl. 8.8 set — frame, struts40 pcs22880
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors79 pcs221,738
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts12 pcs27324
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 40 mm8 pcs35280
Mid clamp (30–40 mm)56 pcs321,792
Bolt M8×60 A2 + spring channel nut M871 pcs14994
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.11 m³90099
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow38 m351,330
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.37 m³3,8005,206
Rebar Ø10 (4 bars per post)84 m282,352
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 4 × 30 mm, 8 × 10 mm24 pcs00
Materials57,973

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 14,690 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.