LONGi

Ground frame for 40 LONGi Hi-MO X10 LR7-54HVH-485M panels (4×10)

4 rows of 10 panels, 19.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
19.40kW
Steel
904.2kg
Posts
18
Bolts
310
Materials
121,252₴
Yield
22,092kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO X10 LR7-54HVH-485M panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames7 frames, pitch up to 1,850 mm9 frames, pitch up to 1,400 mm9 frames, pitch up to 1,400 mm
Posts141818
Footings (bored concrete)14 pcs, Ø450 mm, depth 1,500 mm18 pcs, Ø400 mm, depth 1,300 mm18 pcs, Ø350 mm, depth 1,300 mm
Concrete3.67 m³3.24 m³2.48 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,302 mm600 / 3,302 mm600 / 3,302 mm
Panel field size11,660 × 4,862 mm11,660 × 4,862 mm11,660 × 4,862 mm
Row spacing between tables (no shade on 21 December)16,290 mm at noon · 18,310 mm ±2 h18,050 mm at noon · 20,850 mm ±2 h19,780 mm at noon · 23,510 mm ±2 h
Steel776.7 kg904.2 kg904.2 kg
BoltsM10 — 182, M8 — 88M10 — 222, M8 — 88M10 — 222, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials106,761 UAH121,252 UAH118,348 UAH
With installation and delivery156,091 UAH170,434 UAH167,530 UAH
Per 1 kW8,046 UAH/kW8,785 UAH/kW8,636 UAH/kW
Yield1,266 kWh/kW · 24,569 kWh/year1,139 kWh/kW · 22,092 kWh/year1,043 kWh/kW · 20,237 kWh/year
Strength σ/fy81%62%66%
Deflection / (L/200)74%43%46%
Rafter strength92%92%99%
Post utilisation45%45%49%
Utilisation99%87%100%
Depth vs frost depthokokok
Bolt utilisation78%79%84%
Plate section15%15%16%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 850 mm, 7 frames. Purlin C-channel 41×41×2.5: strength 81%, deflection 74% of L/200 (snow on panel 489 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 863, cantilever 1 399 mm → strength 92%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 863, cantilever 1 399 mm → strength 92%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 863, cantilever 1 399 mm → strength 99%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 20.8 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 13.7 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 13.4 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 100%.
  • Stock length, mmKherson: Rafter 6 660 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 2 120, Кр1б 4 540 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 2 120 mm from the lower end of the rafter, where the moment is small. Bolt: 14.06 kN vs 18.00 kN (78%), plate 15%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 660 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 2 120, Кр1б 4 540 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 2 120 mm from the lower end of the rafter, where the moment is small. Bolt: 14.18 kN vs 18.00 kN (79%), plate 15%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 660 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 2 120, Кр1б 4 540 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 2 120 mm from the lower end of the rafter, where the moment is small. Bolt: 15.18 kN vs 18.00 kN (84%), plate 16%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,6959
П2Rear postTube 60×60×24,6279
Кр1аRafter (inclined beam)C-channel 100×50×2.52,1209
Кр1бRafter (inclined beam)C-channel 100×50×2.54,5409
Н1Rafter splice plateC-channel 100×50×2.53009
Пк1Frame strutC-channel 41×41×2.52,7249
Пк2Front frame strutC-channel 41×41×2.53,6419
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0054
Р1Purlin (rail)C-channel 41×41×2.56,0004
Р2Purlin (rail)C-channel 41×41×2.56,0004
Р3Purlin (rail)C-channel 41×41×2.55,6604
Р4Purlin (rail)C-channel 41×41×2.55,6604
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——41
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——9
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——72
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——45
—Bolt M10×140 set · strut to rafter — through spacer inserts——9
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——36
—End clamp 30 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 18 posts, Ø400×1300——3.23 m³

Profile cutting

60 bars of 6,000 mm, 291.1 m of profile in total.

  • Tube 60×60×214 bars
  • C-channel 100×50×2.514 bars
  • C-channel 41×41×2.532 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
121,252₴
With installation and delivery
170,434₴
Per 1 kW
8,785UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm14 bar21017,640
C-channel 100×50×2.5, stock length 6 000 mm14 bar38031,920
C-channel 41×41×2.5, stock length 6 000 mm32 bar20038,400
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×80 cl. 8.8 set — frame, struts9 pcs22198
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors32 pcs22704
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts9 pcs27243
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter95 pcs272,565
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts45 pcs271,215
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts9 pcs27243
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)36 pcs22792
End clamp 30 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)18 pcs20360
Borehole casing (roofing felt / PVC, 300 mm)18 pcs601,080
Crushed stone 20–40 for the bottom of the boreholes0.23 m³900207
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow35 m351,225
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts3.23 m³3,80012,274
Rebar Ø10 (4 bars per post)108 m283,024
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 9 × 70 mm, 9 × 50 mm, 4 × 30 mm, 9 × 10 mm35 pcs00
Materials121,252

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 22,092 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).