Ground frame for 60 LONGi Hi-MO X10 LR7-54HVH-485M panels (3×20)

3 rows of 20 panels, 29.10 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
29.10kW
Steel
990.5kg
Posts
22
Bolts
362
Materials
139,172₴
Yield
33,139kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO X10 LR7-54HVH-485M panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 80×40×2C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames17 frames, pitch up to 1,420 mm11 frames, pitch up to 2,250 mm11 frames, pitch up to 2,250 mm
Posts342222
Footings (bored concrete)34 pcs, Ø350 mm, depth 1,100 mm22 pcs, Ø400 mm, depth 1,300 mm22 pcs, Ø350 mm, depth 1,500 mm
Concrete3.96 m³3.95 m³3.49 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,575 mm600 / 2,567 mm600 / 2,567 mm
Panel field size23,200 × 3,621 mm23,200 × 3,626 mm23,200 × 3,626 mm
Row spacing between tables (no shade on 21 December)12,210 mm at noon · 13,720 mm ±2 h13,520 mm at noon · 15,620 mm ±2 h14,830 mm at noon · 17,620 mm ±2 h
Steel1,172.4 kg990.5 kg1,006.3 kg
BoltsM10 — 320, M8 — 126M10 — 236, M8 — 126M10 — 236, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials154,539 UAH139,172 UAH137,865 UAH
With installation and delivery227,506 UAH212,667 UAH211,360 UAH
Per 1 kW7,818 UAH/kW7,308 UAH/kW7,263 UAH/kW
Yield1,266 kWh/kW · 36,853 kWh/year1,139 kWh/kW · 33,139 kWh/year1,043 kWh/kW · 30,355 kWh/year
Strength σ/fy26%87%93%
Deflection / (L/200)14%77%82%
Rafter strength70%77%82%
Post utilisation17%37%40%
Utilisation97%97%97%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.1 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 97%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.3 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 15.0 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 97%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 87%, deflection 77% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 93%, deflection 82% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 2 807, cantilever 1 016 mm → strength 82%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,48811
П2Rear postTube 60×60×23,89211
Кр1Rafter (inclined beam)C-channel 100×50×2.54,84011
Пк1Frame strutC-channel 60×40×22,07111
Пк2Front frame strutC-channel 60×40×22,73111
Х1Longitudinal brace (cross)C-channel 60×40×22,9734
Р1Purlin (rail)C-channel 60×40×26,0003
Р2Purlin (rail)C-channel 60×40×26,0003
Р3Purlin (rail)C-channel 60×40×26,0003
Р4Purlin (rail)C-channel 60×40×26,0003
Р5Purlin (rail)C-channel 60×40×26,0003
Р6Purlin (rail)C-channel 60×40×26,0003
Р7Purlin (rail)C-channel 60×40×25,2003
Р8Purlin (rail)C-channel 60×40×25,2003
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——85
—Bolt M10×90 set · strut to post — through spacer inserts——11
—Bolt M10×120 set · purlin to rafter——66
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——55
—Bolt M10×140 set · strut to rafter — through spacer inserts——11
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 22 posts, Ø400×1300——3.95 m³

Profile cutting

65 bars of 6,000 mm, 327.3 m of profile in total.

  • Tube 60×60×217 bars
  • C-channel 100×50×2.511 bars
  • C-channel 60×40×237 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
139,172₴
With installation and delivery
212,667₴
Per 1 kW
7,308UAH/kW

The engine's estimate has 25 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 33,139 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.