Ground frame for 40 LONGi Hi-MO X10 LR7-54HVH-485M panels (2×20)

2 rows of 20 panels, 19.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
19.40kW
Steel
598.1kg
Posts
22
Bolts
252
Materials
78,877₴
Yield
22,092kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO X10 LR7-54HVH-485M panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames10 frames, pitch up to 2,490 mm11 frames, pitch up to 2,250 mm11 frames, pitch up to 2,250 mm
Posts202222
Footings (bored concrete)20 pcs, Ø400 mm, depth 1,100 mm22 pcs, Ø300 mm, depth 1,100 mm22 pcs, Ø300 mm, depth 1,300 mm
Concrete3.04 m³1.88 m³2.22 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,865 mm600 / 1,865 mm600 / 1,865 mm
Panel field size23,200 × 2,371 mm23,200 × 2,371 mm23,200 × 2,371 mm
Row spacing between tables (no shade on 21 December)8,120 mm at noon · 9,130 mm ±2 h9,000 mm at noon · 10,400 mm ±2 h9,870 mm at noon · 11,720 mm ±2 h
Steel570.4 kg598.1 kg614.0 kg
BoltsM10 — 158, M8 — 84M10 — 168, M8 — 84M10 — 168, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials79,896 UAH78,877 UAH80,645 UAH
With installation and delivery129,356 UAH128,309 UAH130,077 UAH
Per 1 kW6,668 UAH/kW6,614 UAH/kW6,705 UAH/kW
Yield1,266 kWh/kW · 24,569 kWh/year1,139 kWh/kW · 22,092 kWh/year1,043 kWh/kW · 20,237 kWh/year
Strength σ/fy75%84%90%
Deflection / (L/200)73%74%80%
Rafter strength67%84%90%
Post utilisation14%17%18%
Utilisation87%97%80%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.2 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 8.9 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 80%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 84%, deflection 74% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 90%, deflection 80% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 752, cantilever 634 mm → strength 84%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 752, cantilever 634 mm → strength 90%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,11411
П2Rear postTube 60×60×22,99011
Кр1Rafter (inclined beam)C-channel 60×40×23,02011
Пк1Frame strutC-channel 60×40×21,45011
Х1Longitudinal brace (cross)C-channel 60×40×22,5844
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×25,2002
Р8Purlin (rail)C-channel 60×40×25,2002
—Bolt M10×25 set · purlins, braces, connectors——50
—Bolt M10×80 set · purlin to rafter——44
—Bolt M10×90 set · strut to post — through spacer inserts——11
—Bolt M10×130 set · post–rafter — through spacer inserts——44
—Bolt M10×140 set · strut to rafter — through spacer inserts——11
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×50 + channel nut——84
—Concrete for 22 posts, Ø300×1100——1.88 m³

Profile cutting

38 bars of 6,000 mm, 208.5 m of profile in total.

  • Tube 60×60×211 bars
  • C-channel 60×40×227 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
78,877₴
With installation and delivery
128,309₴
Per 1 kW
6,614UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 22,092 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.