Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 16 LONGi Hi-MO X10 LR7-54HVH-485M panels (2×8)

2 rows of 8 panels, 7.76 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
7.76kW
Steel
273.4kg
Posts
10
Bolts
112
Materials
37,736₴
Yield
8,837kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO X10 LR7-54HVH-485M panel and the 2 × 8 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 2,170 mm5 frames, pitch up to 2,170 mm5 frames, pitch up to 2,170 mm
Posts101010
Footings (bored concrete)10 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.16 m³0.86 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,865 mm600 / 1,865 mm600 / 1,865 mm
Panel field size9,352 × 2,371 mm9,352 × 2,371 mm9,352 × 2,371 mm
Row spacing between tables (no shade on 21 December)8,120 mm at noon · 9,130 mm ±2 h9,000 mm at noon · 10,400 mm ±2 h9,870 mm at noon · 11,720 mm ±2 h
Steel273.4 kg273.4 kg280.6 kg
BoltsM10 — 76, M8 — 36M10 — 76, M8 — 36M10 — 76, M8 — 36
Panel clampsend 8, middle 28end 8, middle 28end 8, middle 28
Materials38,903 UAH37,736 UAH38,530 UAH
With installation and delivery59,473 UAH58,306 UAH59,100 UAH
Per 1 kW7,664 UAH/kW7,514 UAH/kW7,616 UAH/kW
Yield1,266 kWh/kW · 9,827 kWh/year1,139 kWh/kW · 8,837 kWh/year1,043 kWh/kW · 8,095 kWh/year
Strength σ/fy57%78%84%
Deflection / (L/200)49%67%72%
Rafter strength59%81%87%
Post utilisation12%16%18%
Utilisation89%93%77%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.1 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.8 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 93%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 752, cantilever 634 mm → strength 81%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 752, cantilever 634 mm → strength 87%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 2 170 mm, 5 frames. Purlin C-channel 60×40×2: strength 84%, deflection 72% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1145
П2Rear postTube 60×60×22,9905
Кр1Rafter (inclined beam)C-channel 60×40×23,0205
Пк1Frame strutC-channel 60×40×21,4505
Х1Longitudinal brace (cross)C-channel 60×40×22,5134
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×23,3522
Р4Purlin (rail)C-channel 60×40×23,3522
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——20
—Bolt M10×90 set · strut to post — through spacer inserts——5
—Bolt M10×130 set · post–rafter — through spacer inserts——20
—Bolt M10×140 set · strut to rafter — through spacer inserts——5
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——28
—Bolt M8×50 + channel nut——36
—Concrete for 10 posts, Ø300×1100——0.86 m³

Profile cutting

18 bars of 6,000 mm, 95.3 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×213 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
37,736₴
With installation and delivery
58,306₴
Per 1 kW
7,514UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 8,837 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×8 layout with other panels

Next