Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 24 LONGi Hi-MO X10 LR7-54HVH-485M panels (2×12)

2 rows of 12 panels, 11.64 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
11.64kW
Steel
381.8kg
Posts
14
Bolts
164
Materials
52,007₴
Yield
13,255kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO X10 LR7-54HVH-485M panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,640 mm7 frames, pitch up to 2,220 mm7 frames, pitch up to 2,220 mm
Posts121414
Footings (bored concrete)12 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete1.83 m³1.20 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,865 mm600 / 1,865 mm600 / 1,865 mm
Panel field size13,968 × 2,371 mm13,968 × 2,371 mm13,968 × 2,371 mm
Row spacing between tables (no shade on 21 December)8,120 mm at noon · 9,130 mm ±2 h9,000 mm at noon · 10,400 mm ±2 h9,870 mm at noon · 11,720 mm ±2 h
Steel355.8 kg381.8 kg391.9 kg
BoltsM10 — 102, M8 — 52M10 — 112, M8 — 52M10 — 112, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials50,966 UAH52,007 UAH53,151 UAH
With installation and delivery81,226 UAH82,217 UAH83,361 UAH
Per 1 kW6,978 UAH/kW7,063 UAH/kW7,162 UAH/kW
Yield1,266 kWh/kW · 14,741 kWh/year1,139 kWh/kW · 13,255 kWh/year1,043 kWh/kW · 12,142 kWh/year
Strength σ/fy84%82%88%
Deflection / (L/200)88%71%77%
Rafter strength71%82%89%
Post utilisation14%17%18%
Utilisation92%96%79%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 640 mm, 6 frames. Purlin C-channel 60×40×2: strength 84%, deflection 88% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 82%, deflection 71% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 88%, deflection 77% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.3 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 92%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.0 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 96%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 752, cantilever 634 mm → strength 82%.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 752, cantilever 634 mm → strength 89%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1147
П2Rear postTube 60×60×22,9907
Кр1Rafter (inclined beam)C-channel 60×40×23,0207
Пк1Frame strutC-channel 60×40×21,4507
Х1Longitudinal brace (cross)C-channel 60×40×22,5574
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×21,9682
Р6Purlin (rail)C-channel 60×40×21,9682
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

25 bars of 6,000 mm, 133.1 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×218 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
52,007₴
With installation and delivery
82,217₴
Per 1 kW
7,063UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 13,255 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.