LONGi
Ground frame for 10 LONGi Hi-MO X10 LR7-54HVH-485M panels (2×5)
2 rows of 5 panels, 4.85 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 4.85kW
- Steel
- 203.9kg
- Posts
- 8
- Bolts
- 74
- Materials
- 27,451₴
- Yield
- 5,523kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the LONGi Hi-MO X10 LR7-54HVH-485M panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | C-channel 100×50×2.5 | C-channel 60×40×2 | C-channel 60×40×2 |
| Purlins and braces | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Frames | 4 frames, pitch up to 1,780 mm | 4 frames, pitch up to 1,780 mm | 4 frames, pitch up to 1,780 mm |
| Posts | 8 | 8 | 8 |
| Footings (bored concrete) | 8 pcs, Ø350 mm, depth 1,300 mm | 8 pcs, Ø300 mm, depth 1,100 mm | 8 pcs, Ø300 mm, depth 1,300 mm |
| Concrete | 1.10 m³ | 0.68 m³ | 0.81 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 1,848 mm | 600 / 1,865 mm | 600 / 1,865 mm |
| Panel field size | 5,890 × 2,381 mm | 5,890 × 2,371 mm | 5,890 × 2,371 mm |
| Row spacing between tables (no shade on 21 December) | 8,120 mm at noon · 9,130 mm ±2 h | 9,000 mm at noon · 10,400 mm ±2 h | 9,870 mm at noon · 11,720 mm ±2 h |
| Steel | 224.6 kg | 203.9 kg | 209.6 kg |
| Bolts | M10 — 50, M8 — 24 | M10 — 50, M8 — 24 | M10 — 50, M8 — 24 |
| Panel clamps | end 8, middle 16 | end 8, middle 16 | end 8, middle 16 |
| Materials | 35,593 UAH | 27,451 UAH | 28,113 UAH |
| With installation and delivery | 48,948 UAH | 40,806 UAH | 41,468 UAH |
| Per 1 kW | 10,092 UAH/kW | 8,414 UAH/kW | 8,550 UAH/kW |
| Yield | 1,266 kWh/kW · 6,142 kWh/year | 1,139 kWh/kW · 5,523 kWh/year | 1,043 kWh/kW · 5,059 kWh/year |
| Strength σ/fy | 38% | 53% | 57% |
| Deflection / (L/200) | 27% | 37% | 40% |
| Rafter strength | 17% | 66% | 71% |
| Post utilisation | 10% | 13% | 14% |
| Utilisation | 62% | 77% | 63% |
| Depth vs frost depth | ok | ok | ok |
| Checks overall | passes | passes | passes |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
No cautions.
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,114 | 4 |
| П2 | Rear post | Tube 60×60×2 | 2,990 | 4 |
| Кр1 | Rafter (inclined beam) | C-channel 60×40×2 | 3,020 | 4 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,450 | 4 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,177 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 5,890 | 4 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 2 |
| — | Bolt M10×80 set · purlin to rafter | — | — | 16 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 4 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 16 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 4 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 30 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 16 |
| — | Bolt M8×50 + channel nut | — | — | 24 |
| — | Concrete for 8 posts, Ø300×1100 | — | — | 0.68 m³ |
Profile cutting
13 bars of 6,000 mm, 70.6 m of profile in total.
- Tube 60×60×24 bars
- C-channel 60×40×29 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 27,451₴
- With installation and delivery
- 40,806₴
- Per 1 kW
- 8,414UAH/kW
The engine's estimate has 22 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 5,523 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.