Section of the table from the Solispec engine (median zone — Cherkasy)

Trina

Ground frame for 40 Trina Vertex N TSM-690NEG21C.20 panels (4×10)

4 rows of 10 panels, 27.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
27.60kW
Steel
1,617.5kg
Posts
27
Bolts
360
Materials
205,761₴
Yield
31,430kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Trina Vertex N TSM-690NEG21C.20 panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 80×80×3Tube 80×80×3Tube 80×80×3
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames10 frames, pitch up to 1,440 mm9 frames, pitch up to 1,610 mm9 frames, pitch up to 1,610 mm
Posts302727
Footings (bored concrete)30 pcs, Ø500 mm, depth 1,500 mm27 pcs, Ø500 mm, depth 1,500 mm27 pcs, Ø500 mm, depth 1,500 mm
Concrete9.72 m³8.75 m³8.75 m³
Tilt30°30°30°
Panel bottom / post top600 / 4,471 mm600 / 4,455 mm600 / 4,455 mm
Panel field size13,350 × 6,887 mm13,350 × 6,897 mm13,350 × 6,897 mm
Row spacing between tables (no shade on 21 December)21,530 mm at noon · 24,200 mm ±2 h23,850 mm at noon · 27,550 mm ±2 h26,150 mm at noon · 31,070 mm ±2 h
Steel1,765.2 kg1,617.5 kg1,617.5 kg
BoltsM10 — 294, M8 — 88M10 — 272, M8 — 88M10 — 272, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials215,634 UAH205,761 UAH205,761 UAH
With installation and delivery285,156 UAH275,338 UAH275,338 UAH
Per 1 kW10,332 UAH/kW9,976 UAH/kW9,976 UAH/kW
Yield1,266 kWh/kW · 34,953 kWh/year1,139 kWh/kW · 31,430 kWh/year1,043 kWh/kW · 28,790 kWh/year
Strength σ/fy68%62%66%
Deflection / (L/200)48%39%42%
Rafter strength61%90%96%
Post utilisation25%37%39%
Post utilisation П38%11%12%
Utilisation96%94%91%
Depth vs frost depthokokok
Bolt utilisation37%54%57%
Plate section6%9%9%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 23.0 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 22.5 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 94%.Chernihiv: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 22.0 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 91%.
  • Stock length, mmKherson: Rafter 8 736 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 620, Кр1б 5 116 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 620 mm from the lower end of the rafter, where the moment is small. Bolt: 6.59 kN vs 18.00 kN (37%), plate 6%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 8 736 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 620, Кр1б 5 116 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 620 mm from the lower end of the rafter, where the moment is small. Bolt: 9.69 kN vs 18.00 kN (54%), plate 9%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 8 736 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 620, Кр1б 5 116 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 620 mm from the lower end of the rafter, where the moment is small. Bolt: 10.34 kN vs 18.00 kN (57%), plate 9%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter · C-channel 100×50×2.5 · 3 posts, spans between posts 3 102 mm, cantilever 1 266 mm — continuous beam on 3 supports → strength 90%.Chernihiv: Rafter · C-channel 100×50×2.5 · 3 posts, spans between posts 3 102 mm, cantilever 1 266 mm — continuous beam on 3 supports → strength 96%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 80×80×32,8789
П2Rear postTube 80×80×35,9809
П3Middle postTube 80×80×34,4299
Кр1аRafter (inclined beam)C-channel 100×50×2.53,6209
Кр1бRafter (inclined beam)C-channel 100×50×2.55,1169
Н1Rafter splice plateC-channel 100×50×2.53009
Пк1Frame strutC-channel 60×40×23,7339
Пк2Front frame strutC-channel 60×40×22,3599
Х1Longitudinal brace (cross)C-channel 60×40×24,1354
Р1Purlin (rail)C-channel 60×40×26,0004
Р2Purlin (rail)C-channel 60×40×26,0004
Р3Purlin (rail)C-channel 60×40×26,0004
Р4Purlin (rail)C-channel 60×40×26,0004
Р5Purlin (rail)C-channel 60×40×21,3504
Р6Purlin (rail)C-channel 60×40×21,3504
—Bolt M10×100 / M10×25 set · frame and struts / purlins, braces, connectors——75
—Bolt M10×120 set · purlin to rafter——72
—Bolt M10×140 set · strut to post——9
—Bolt M10×150 set · post–rafter, strut to rafter — through spacer inserts——63
—Bolt M10×160 set · brace to post — through spacer inserts——8
—Bolt M10×200 set · strut to rafter — through spacer inserts——9
—Bolt M10×25 set · rafter splice (plate Н1)——36
—End clamp 33 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 27 posts, Ø500×1500——8.75 m³

Profile cutting

75 bars of 6,000 mm, 379.1 m of profile in total.

  • Tube 80×80×323 bars
  • C-channel 100×50×2.518 bars
  • C-channel 60×40×234 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
205,761₴
With installation and delivery
275,338₴
Per 1 kW
9,976UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 26 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 80×80×3, stock length 6 000 mm23 bar42057,960
C-channel 100×50×2.5, stock length 6 000 mm18 bar38041,040
C-channel 60×40×2, stock length 6 000 mm34 bar23046,920
C-channel connector (splice plate L 300)16 pcs901,440
Bolt M10×100 cl. 8.8 set — frame, struts9 pcs22198
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors66 pcs221,452
Bolt M10×120 cl. 8.8 set — purlin to rafter100 pcs272,700
Bolt M10×140 cl. 8.8 set — strut to post9 pcs27243
Bolt M10×150 cl. 8.8 set — post–rafter, strut to rafter — through spacer inserts63 pcs271,701
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
Bolt M10×200 cl. 8.8 set — strut to rafter — through spacer inserts9 pcs27243
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)36 pcs22792
End clamp 33 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)27 pcs20540
Borehole casing (roofing felt / PVC, 300 mm)27 pcs601,620
Crushed stone 20–40 for the bottom of the boreholes0.53 m³900477
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow37 m351,295
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml4 pcs3501,400
Concrete M200 for posts8.75 m³3,80033,250
Rebar Ø10 (4 bars per post)184 m285,152
Spacer inserts / packs — pieces of the same profile (from offcuts): 18 × 80 mm, 4 × 61 mm, 4 × 20 mm26 pcs00
Materials205,761

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 31,430 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.