Ground frame for 20 Trina Vertex N TSM-690NEG21C.20 panels (2×10)
2 rows of 10 panels, 13.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 13.80kW
- Steel
- 444.1kg
- Posts
- 16
- Bolts
- 166
- Materials
- 63,088₴
- Yield
- 15,715kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the Trina Vertex N TSM-690NEG21C.20 panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | C-channel 60×40×2 | C-channel 80×40×2 | C-channel 80×40×2 |
| Purlins and braces | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Frames | 8 frames, pitch up to 1,830 mm | 8 frames, pitch up to 1,830 mm | 8 frames, pitch up to 1,830 mm |
| Posts | 16 | 16 | 16 |
| Footings (bored concrete) | 16 pcs, Ø400 mm, depth 1,100 mm | 16 pcs, Ø350 mm, depth 1,100 mm | 16 pcs, Ø300 mm, depth 1,300 mm |
| Concrete | 2.43 m³ | 1.86 m³ | 1.62 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 2,289 mm | 600 / 2,280 mm | 600 / 2,280 mm |
| Panel field size | 13,350 × 3,105 mm | 13,350 × 3,110 mm | 13,350 × 3,110 mm |
| Row spacing between tables (no shade on 21 December) | 10,740 mm at noon · 12,080 mm ±2 h | 11,900 mm at noon · 13,750 mm ±2 h | 13,050 mm at noon · 15,510 mm ±2 h |
| Steel | 447.9 kg | 444.1 kg | 455.6 kg |
| Bolts | M10 — 122, M8 — 44 | M10 — 122, M8 — 44 | M10 — 122, M8 — 44 |
| Panel clamps | end 8, middle 36 | end 8, middle 36 | end 8, middle 36 |
| Materials | 59,719 UAH | 63,088 UAH | 67,516 UAH |
| With installation and delivery | 95,279 UAH | 98,648 UAH | 103,076 UAH |
| Per 1 kW | 6,904 UAH/kW | 7,148 UAH/kW | 7,469 UAH/kW |
| Yield | 1,266 kWh/kW · 17,477 kWh/year | 1,139 kWh/kW · 15,715 kWh/year | 1,043 kWh/kW · 14,395 kWh/year |
| Strength σ/fy | 55% | 75% | 81% |
| Deflection / (L/200) | 40% | 54% | 58% |
| Rafter strength | 87% | 80% | 85% |
| Post utilisation | 17% | 23% | 24% |
| Utilisation | 91% | 93% | 93% |
| Depth vs frost depth | ok | ok | ok |
| Checks overall | with a caution | with a caution | with a caution |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 278, cantilever 825 mm → strength 87%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 278, cantilever 825 mm → strength 85%.
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 91%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.6 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 93%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.4 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 93%.
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 830 mm, 8 frames. Purlin C-channel 60×40×2: strength 81%, deflection 58% of L/200 (snow on panel 1 106 Pa).
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,266 | 8 |
| П2 | Rear post | Tube 60×60×2 | 3,405 | 8 |
| Кр1 | Rafter (inclined beam) | C-channel 80×40×2 | 3,928 | 8 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,812 | 8 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,468 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 1,350 | 2 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 1,350 | 2 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 34 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 8 |
| — | Bolt M10×100 set · purlin to rafter | — | — | 32 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 32 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 8 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 33 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 36 |
| — | Bolt M8×50 + channel nut | — | — | 44 |
| — | Concrete for 16 posts, Ø350×1100 | — | — | 1.86 m³ |
Profile cutting
30 bars of 6,000 mm, 154.6 m of profile in total.
- Tube 60×60×28 bars
- C-channel 80×40×28 bars
- C-channel 60×40×214 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 63,088₴
- With installation and delivery
- 98,648₴
- Per 1 kW
- 7,148UAH/kW
The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 15,715 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).