Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 60 LONGi Hi-MO 5 LR5-72HBD-545M panels (3×20)

3 rows of 20 panels, 32.70 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
32.70kW
Steel
1,306.7kg
Posts
28
Bolts
460
Materials
168,708₴
Yield
37,238kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO 5 LR5-72HBD-545M panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames11 frames, pitch up to 2,250 mm14 frames, pitch up to 1,740 mm14 frames, pitch up to 1,740 mm
Posts222828
Footings (bored concrete)22 pcs, Ø500 mm, depth 1,500 mm28 pcs, Ø400 mm, depth 1,300 mm28 pcs, Ø350 mm, depth 1,500 mm
Concrete7.13 m³5.03 m³4.45 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,078 mm600 / 3,078 mm600 / 3,078 mm
Panel field size23,180 × 4,512 mm23,180 × 4,512 mm23,180 × 4,512 mm
Row spacing between tables (no shade on 21 December)15,270 mm at noon · 17,170 mm ±2 h16,920 mm at noon · 19,550 mm ±2 h18,550 mm at noon · 22,050 mm ±2 h
Steel1,130.1 kg1,306.7 kg1,326.8 kg
BoltsM10 — 280, M8 — 126M10 — 334, M8 — 126M10 — 334, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials160,271 UAH168,708 UAH167,038 UAH
With installation and delivery242,788 UAH250,860 UAH249,190 UAH
Per 1 kW7,425 UAH/kW7,672 UAH/kW7,620 UAH/kW
Yield1,266 kWh/kW · 41,412 kWh/year1,139 kWh/kW · 37,238 kWh/year1,043 kWh/kW · 34,110 kWh/year
Strength σ/fy83%66%71%
Deflection / (L/200)74%45%49%
Rafter strength90%93%100%
Post utilisation46%47%51%
Utilisation97%100%99%
Depth vs frost depthokokok
Bolt utilisation26%26%28%
Plate section5%5%6%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 83%, deflection 74% of L/200 (snow on panel 489 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 485, cantilever 1 262 mm → strength 90%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 485, cantilever 1 262 mm → strength 93%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 485, cantilever 1 262 mm → strength 100%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 23.3 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 97%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 15.8 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 100%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 15.4 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 99%.
  • Stock length, mmKherson: Rafter 6 008 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 708 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 4.59 kN vs 18.00 kN (26%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 008 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 708 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 4.74 kN vs 18.00 kN (26%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 008 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 708 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 5.08 kN vs 18.00 kN (28%), plate 6%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,66114
П2Rear postTube 60×60×24,40314
Кр1аRafter (inclined beam)C-channel 100×50×2.530014
Кр1бRafter (inclined beam)C-channel 100×50×2.55,70814
Н1Rafter splice plateC-channel 100×50×2.530014
Пк1Frame strutC-channel 60×40×22,52114
Пк2Front frame strutC-channel 60×40×23,34314
Х1Longitudinal brace (cross)C-channel 60×40×22,9974
Р1Purlin (rail)C-channel 60×40×26,0003
Р2Purlin (rail)C-channel 60×40×26,0003
Р3Purlin (rail)C-channel 60×40×26,0003
Р4Purlin (rail)C-channel 60×40×26,0003
Р5Purlin (rail)C-channel 60×40×26,0003
Р6Purlin (rail)C-channel 60×40×26,0003
Р7Purlin (rail)C-channel 60×40×25,1803
Р8Purlin (rail)C-channel 60×40×25,1803
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——88
—Bolt M10×90 set · strut to post — through spacer inserts——14
—Bolt M10×120 set · purlin to rafter——84
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——70
—Bolt M10×140 set · strut to rafter — through spacer inserts——14
—Bolt M10×150 set · brace to post — through spacer inserts——8
—Bolt M10×25 set · rafter splice (plate Н1)——56
—End clamp 35 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×55 + channel nut——126
—Concrete for 28 posts, Ø400×1300——5.03 m³

Profile cutting

77 bars of 6,000 mm, 420.4 m of profile in total.

  • Tube 60×60×221 bars
  • C-channel 100×50×2.516 bars
  • C-channel 60×40×240 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
168,708₴
With installation and delivery
250,860₴
Per 1 kW
7,672UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 26 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm21 bar21026,460
C-channel 100×50×2.5, stock length 6 000 mm16 bar38036,480
C-channel 60×40×2, stock length 6 000 mm40 bar23055,200
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×80 cl. 8.8 set — frame, struts14 pcs22308
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors74 pcs221,628
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts14 pcs27378
Bolt M10×120 cl. 8.8 set — purlin to rafter118 pcs273,186
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts70 pcs271,890
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts14 pcs27378
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)56 pcs221,232
End clamp 35 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×55 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)28 pcs20560
Borehole casing (roofing felt / PVC, 300 mm)28 pcs601,680
Crushed stone 20–40 for the bottom of the boreholes0.35 m³900315
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow57 m351,995
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml5 pcs3501,750
Concrete M200 for posts5.03 m³3,80019,114
Rebar Ø10 (4 bars per post)168 m284,704
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 14 × 70 mm, 14 × 50 mm, 4 × 30 mm, 14 × 10 mm50 pcs00
Materials168,708

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 37,238 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.