Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 12 LONGi Hi-MO 5 LR5-72HBD-545M panels (2×6)

2 rows of 6 panels, 6.54 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
6.54kW
Steel
258.4kg
Posts
8
Bolts
94
Materials
33,741₴
Yield
7,448kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO 5 LR5-72HBD-545M panel and the 2 × 6 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 2,130 mm4 frames, pitch up to 2,130 mm5 frames, pitch up to 1,640 mm
Posts8810
Footings (bored concrete)8 pcs, Ø400 mm, depth 1,100 mm8 pcs, Ø350 mm, depth 1,300 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.22 m³1.10 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,196 mm600 / 2,196 mm600 / 2,196 mm
Panel field size7,038 × 2,945 mm7,038 × 2,945 mm7,038 × 2,945 mm
Row spacing between tables (no shade on 21 December)10,170 mm at noon · 11,430 mm ±2 h11,270 mm at noon · 13,010 mm ±2 h12,350 mm at noon · 14,680 mm ±2 h
Steel237.7 kg258.4 kg293.9 kg
BoltsM10 — 66, M8 — 28M10 — 66, M8 — 28M10 — 76, M8 — 28
Panel clampsend 8, middle 20end 8, middle 20end 8, middle 20
Materials33,327 UAH33,741 UAH37,073 UAH
With installation and delivery50,959 UAH51,553 UAH54,858 UAH
Per 1 kW7,792 UAH/kW7,883 UAH/kW8,388 UAH/kW
Yield1,266 kWh/kW · 8,282 kWh/year1,139 kWh/kW · 7,448 kWh/year1,043 kWh/kW · 6,822 kWh/year
Strength σ/fy71%96%61%
Deflection / (L/200)59%80%39%
Rafter strength90%80%66%
Post utilisation18%24%20%
Utilisation99%86%78%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionpasses

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 165, cantilever 784 mm → strength 90%.Cherkasy: Rafter Tube 60×60×2: span between posts 2 165, cantilever 784 mm → strength 80%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.2 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 11.5 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 86%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 130 mm, 4 frames. Purlin C-channel 60×40×2: strength 96%, deflection 80% of L/200 (snow on panel 977 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4394
П2Rear postTube 60×60×23,5214
Кр1Rafter (inclined beam)Tube 60×60×23,7324
Пк1Frame strutC-channel 60×40×21,7394
Х1Longitudinal brace (cross)C-channel 60×40×22,6534
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×21,0382
Р4Purlin (rail)C-channel 60×40×21,0382
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——54
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——12
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——20
—Bolt M8×55 + channel nut——28
—Concrete for 8 posts, Ø350×1300——1.10 m³

Profile cutting

16 bars of 6,000 mm, 84.5 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
33,741₴
With installation and delivery
51,553₴
Per 1 kW
7,883UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm8 bar21010,080
C-channel 60×40×2, stock length 6 000 mm8 bar23011,040
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×140 cl. 8.8 set — frame, struts20 pcs22440
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors41 pcs22902
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts12 pcs27324
End clamp 35 mm8 pcs35280
Mid clamp (30–40 mm)20 pcs32640
Bolt M8×55 A2 + spring channel nut M831 pcs14434
Post base anchor pin (M10 / rebar Ø12)8 pcs20160
Borehole casing (roofing felt / PVC, 300 mm)8 pcs60480
Crushed stone 20–40 for the bottom of the boreholes0.08 m³90072
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow21 m35735
Module earthing clip (under the clamp)12 pcs20240
Cable clip, stainless36 pcs5180
Zinc paint / cold galvanising spray 400 ml1 pcs350350
Concrete M200 for posts1.10 m³3,8004,180
Rebar Ø10 (4 bars per post)48 m281,344
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 4 × 70 mm, 4 × 30 mm, 4 × 10 mm16 pcs00
Materials33,741

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 7,448 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×6 layout with other panels

Next