Ground frame for 16 LONGi Hi-MO 5 LR5-72HBD-545M panels (2×8)

2 rows of 8 panels, 8.72 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
8.72kW
Steel
301.2kg
Posts
10
Bolts
112
Materials
45,003₴
Yield
9,930kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO 5 LR5-72HBD-545M panel and the 2 × 8 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 1,760 mm5 frames, pitch up to 2,170 mm6 frames, pitch up to 1,760 mm
Posts121012
Footings (bored concrete)12 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø350 mm, depth 1,300 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.40 m³1.38 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,196 mm600 / 2,188 mm600 / 2,188 mm
Panel field size9,344 × 2,945 mm9,344 × 2,950 mm9,344 × 2,950 mm
Row spacing between tables (no shade on 21 December)10,170 mm at noon · 11,430 mm ±2 h11,270 mm at noon · 13,010 mm ±2 h12,350 mm at noon · 14,680 mm ±2 h
Steel327.2 kg301.2 kg333.0 kg
BoltsM10 — 86, M8 — 36M10 — 76, M8 — 36M10 — 86, M8 — 36
Panel clampsend 8, middle 28end 8, middle 28end 8, middle 28
Materials43,308 UAH45,003 UAH46,642 UAH
With installation and delivery66,245 UAH67,973 UAH69,579 UAH
Per 1 kW7,597 UAH/kW7,795 UAH/kW7,979 UAH/kW
Yield1,266 kWh/kW · 11,043 kWh/year1,139 kWh/kW · 9,930 kWh/year1,043 kWh/kW · 9,096 kWh/year
Strength σ/fy48%100%71%
Deflection / (L/200)33%85%49%
Rafter strength75%85%74%
Post utilisation15%24%21%
Utilisation96%87%83%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.9 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 11.7 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.3 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 83%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 170 mm, 5 frames. Purlin C-channel 60×40×2: strength 100%, deflection 85% of L/200 (snow on panel 977 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 165, cantilever 784 mm → strength 85%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4305
П2Rear postTube 60×60×23,5135
Кр1Rafter (inclined beam)C-channel 80×40×23,7325
Пк1Frame strutC-channel 60×40×21,7325
Х1Longitudinal brace (cross)C-channel 60×40×22,6814
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×23,3442
Р4Purlin (rail)C-channel 60×40×23,3442
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×90 set · strut to post — through spacer inserts——5
—Bolt M10×100 set · purlin to rafter——20
—Bolt M10×130 set · post–rafter — through spacer inserts——20
—Bolt M10×140 set · strut to rafter — through spacer inserts——5
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——28
—Bolt M8×55 + channel nut——36
—Concrete for 10 posts, Ø350×1300——1.38 m³

Profile cutting

21 bars of 6,000 mm, 105.1 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 80×40×25 bars
  • C-channel 60×40×211 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
45,003₴
With installation and delivery
67,973₴
Per 1 kW
7,795UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 9,930 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.