Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 10 LONGi Hi-MO 5 LR5-72HBD-545M panels (2×5)

2 rows of 5 panels, 5.45 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
5.45kW
Steel
247.3kg
Posts
8
Bolts
74
Materials
36,973₴
Yield
6,206kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO 5 LR5-72HBD-545M panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 100×50×2.5C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm
Posts888
Footings (bored concrete)8 pcs, Ø350 mm, depth 1,100 mm8 pcs, Ø350 mm, depth 1,300 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete0.93 m³1.10 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,196 mm600 / 2,179 mm600 / 2,188 mm
Panel field size5,885 × 2,945 mm5,885 × 2,955 mm5,885 × 2,950 mm
Row spacing between tables (no shade on 21 December)10,170 mm at noon · 11,430 mm ±2 h11,270 mm at noon · 13,010 mm ±2 h12,350 mm at noon · 14,680 mm ±2 h
Steel222.9 kg247.3 kg226.8 kg
BoltsM10 — 50, M8 — 24M10 — 50, M8 — 24M10 — 50, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials29,799 UAH36,973 UAH32,973 UAH
With installation and delivery44,654 UAH51,828 UAH47,828 UAH
Per 1 kW8,193 UAH/kW9,510 UAH/kW8,776 UAH/kW
Yield1,266 kWh/kW · 6,902 kWh/year1,139 kWh/kW · 6,206 kWh/year1,043 kWh/kW · 5,685 kWh/year
Strength σ/fy49%67%72%
Deflection / (L/200)35%47%50%
Rafter strength75%35%75%
Post utilisation15%20%21%
Utilisation97%72%84%
Depth vs frost depthokokok
Checks overallwith a cautionpasseswith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.0 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.4 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 84%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4224
П2Rear postTube 60×60×23,5044
Кр1Rafter (inclined beam)C-channel 100×50×2.53,7324
Пк1Frame strutC-channel 60×40×21,7254
Х1Longitudinal brace (cross)C-channel 60×40×22,3644
Р1Purlin (rail)C-channel 60×40×25,8854
—Bolt M10×25 set · purlins, braces, connectors——2
—Bolt M10×90 set · strut to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——16
—Bolt M10×130 set · post–rafter——16
—Bolt M10×140 set · strut to rafter — through spacer inserts——4
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×55 + channel nut——24
—Concrete for 8 posts, Ø350×1300——1.10 m³

Profile cutting

16 bars of 6,000 mm, 78.5 m of profile in total.

  • Tube 60×60×24 bars
  • C-channel 100×50×2.54 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
36,973₴
With installation and delivery
51,828₴
Per 1 kW
9,510UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 6,206 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×5 layout with other panels

Next