Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 40 LONGi Hi-MO 5 LR5-72HBD-545M panels (2×20)

2 rows of 20 panels, 21.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
21.80kW
Steel
724.5kg
Posts
26
Bolts
272
Materials
101,312₴
Yield
24,825kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO 5 LR5-72HBD-545M panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames13 frames, pitch up to 1,880 mm13 frames, pitch up to 1,880 mm13 frames, pitch up to 1,880 mm
Posts262626
Footings (bored concrete)26 pcs, Ø400 mm, depth 1,100 mm26 pcs, Ø300 mm, depth 1,300 mm26 pcs, Ø300 mm, depth 1,300 mm
Concrete3.95 m³2.63 m³2.63 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,196 mm600 / 2,188 mm600 / 2,188 mm
Panel field size23,180 × 2,945 mm23,180 × 2,950 mm23,180 × 2,950 mm
Row spacing between tables (no shade on 21 December)10,170 mm at noon · 11,430 mm ±2 h11,270 mm at noon · 13,010 mm ±2 h12,350 mm at noon · 14,680 mm ±2 h
Steel711.7 kg724.5 kg724.5 kg
BoltsM10 — 188, M8 — 84M10 — 188, M8 — 84M10 — 188, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials96,663 UAH101,312 UAH101,312 UAH
With installation and delivery151,900 UAH156,549 UAH156,549 UAH
Per 1 kW6,968 UAH/kW7,181 UAH/kW7,181 UAH/kW
Yield1,266 kWh/kW · 27,608 kWh/year1,139 kWh/kW · 24,825 kWh/year1,043 kWh/kW · 22,740 kWh/year
Strength σ/fy55%75%80%
Deflection / (L/200)41%55%59%
Rafter strength80%73%79%
Post utilisation16%21%23%
Utilisation87%91%89%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.2 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 91%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.9 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 89%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 880 mm, 13 frames. Purlin C-channel 60×40×2: strength 80%, deflection 59% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,43013
П2Rear postTube 60×60×23,51313
Кр1Rafter (inclined beam)C-channel 80×40×23,73213
Пк1Frame strutC-channel 60×40×21,73213
Х1Longitudinal brace (cross)C-channel 60×40×22,4474
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×25,1802
Р8Purlin (rail)C-channel 60×40×25,1802
—Bolt M10×25 set · purlins, braces, connectors——50
—Bolt M10×90 set · strut to post — through spacer inserts——13
—Bolt M10×100 set · purlin to rafter——52
—Bolt M10×130 set · post–rafter — through spacer inserts——52
—Bolt M10×140 set · strut to rafter — through spacer inserts——13
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×55 + channel nut——84
—Concrete for 26 posts, Ø300×1300——2.63 m³

Profile cutting

49 bars of 6,000 mm, 250.8 m of profile in total.

  • Tube 60×60×213 bars
  • C-channel 80×40×213 bars
  • C-channel 60×40×223 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
101,312₴
With installation and delivery
156,549₴
Per 1 kW
7,181UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 24,825 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.