Section of the table from the Solispec engine (median zone — Cherkasy)

Leapton

Ground frame for 40 Leapton LP210*210-M-66-NB 700W panels (2×20)

2 rows of 20 panels, 28.00 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
28.00kW
Steel
854.4kg
Posts
28
Bolts
298
Materials
109,417₴
Yield
31,886kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Leapton LP210*210-M-66-NB 700W panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames14 frames, pitch up to 2,000 mm14 frames, pitch up to 2,000 mm14 frames, pitch up to 2,000 mm
Posts282828
Footings (bored concrete)28 pcs, Ø400 mm, depth 1,100 mm28 pcs, Ø400 mm, depth 1,100 mm28 pcs, Ø300 mm, depth 1,500 mm
Concrete4.26 m³4.26 m³3.27 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,289 mm600 / 2,289 mm600 / 2,289 mm
Panel field size26,580 × 3,105 mm26,580 × 3,105 mm26,580 × 3,105 mm
Row spacing between tables (no shade on 21 December)10,740 mm at noon · 12,080 mm ±2 h11,900 mm at noon · 13,750 mm ±2 h13,050 mm at noon · 15,510 mm ±2 h
Steel799.4 kg854.4 kg894.7 kg
BoltsM10 — 214, M8 — 84M10 — 214, M8 — 84M10 — 214, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials104,827 UAH109,417 UAH115,600 UAH
With installation and delivery175,587 UAH180,807 UAH186,990 UAH
Per 1 kW6,271 UAH/kW6,457 UAH/kW6,678 UAH/kW
Yield1,266 kWh/kW · 35,460 kWh/year1,139 kWh/kW · 31,886 kWh/year1,043 kWh/kW · 29,208 kWh/year
Strength σ/fy66%90%97%
Deflection / (L/200)52%71%76%
Rafter strength95%84%90%
Post utilisation18%25%27%
Utilisation99%87%88%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 278, cantilever 825 mm → strength 95%.Cherkasy: Rafter Tube 60×60×2: span between posts 2 278, cantilever 825 mm → strength 84%.Chernihiv: Rafter Tube 60×60×2: span between posts 2 278, cantilever 825 mm → strength 90%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.3 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 99%.Cherkasy: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø300 × 1 500: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.3 kN (with γ=1.5) vs ≈ 12.9 kN (concrete weight + soil friction, estimate) → 88%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 000 mm, 14 frames. Purlin C-channel 60×40×2: strength 90%, deflection 71% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 000 mm, 14 frames. Purlin C-channel 60×40×2: strength 97%, deflection 76% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,27414
П2Rear postTube 60×60×23,41414
Кр1Rafter (inclined beam)Tube 60×60×23,92814
Пк1Frame strutC-channel 60×40×21,82014
Х1Longitudinal brace (cross)C-channel 60×40×22,6044
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0006
Р3Purlin (rail)C-channel 60×40×26,0006
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×22,5802
Р6Purlin (rail)C-channel 60×40×22,5802
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——192
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——22
—End clamp 33 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×50 + channel nut——84
—Concrete for 28 posts, Ø400×1100——4.26 m³

Profile cutting

53 bars of 6,000 mm, 276.8 m of profile in total.

  • Tube 60×60×228 bars
  • C-channel 60×40×225 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
109,417₴
With installation and delivery
180,807₴
Per 1 kW
6,457UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm28 bar21035,280
C-channel 60×40×2, stock length 6 000 mm25 bar23034,500
C-channel connector (splice plate L 300)16 pcs901,440
Bolt M10×140 cl. 8.8 set — frame, struts70 pcs221,540
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors144 pcs223,168
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts22 pcs27594
End clamp 33 mm8 pcs35280
Mid clamp (30–40 mm)76 pcs322,432
Bolt M8×50 A2 + spring channel nut M893 pcs141,302
Post base anchor pin (M10 / rebar Ø12)28 pcs20560
Borehole casing (roofing felt / PVC, 300 mm)28 pcs601,680
Crushed stone 20–40 for the bottom of the boreholes0.35 m³900315
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow60 m352,100
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts4.26 m³3,80016,188
Rebar Ø10 (4 bars per post)146 m284,088
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 14 × 70 mm, 4 × 30 mm, 14 × 10 mm36 pcs00
Materials109,417

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 31,886 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×20 layout with other panels

Next