Section of the table from the Solispec engine (median zone — Cherkasy)

Leapton

Ground frame for 12 Leapton LP210*210-M-66-NB 700W panels (2×6)

2 rows of 6 panels, 8.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
8.40kW
Steel
284.5kg
Posts
10
Bolts
104
Materials
40,626₴
Yield
9,566kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Leapton LP210*210-M-66-NB 700W panel and the 2 × 6 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 1,870 mm5 frames, pitch up to 1,870 mm5 frames, pitch up to 1,870 mm
Posts101010
Footings (bored concrete)10 pcs, Ø400 mm, depth 1,100 mm10 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.52 m³1.16 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,289 mm600 / 2,280 mm600 / 2,280 mm
Panel field size8,058 × 3,105 mm8,058 × 3,110 mm8,058 × 3,110 mm
Row spacing between tables (no shade on 21 December)10,740 mm at noon · 12,080 mm ±2 h11,900 mm at noon · 13,750 mm ±2 h13,050 mm at noon · 15,510 mm ±2 h
Steel287.0 kg284.5 kg291.7 kg
BoltsM10 — 76, M8 — 28M10 — 76, M8 — 28M10 — 76, M8 — 28
Panel clampsend 8, middle 20end 8, middle 20end 8, middle 20
Materials39,741 UAH40,626 UAH44,033 UAH
With installation and delivery61,911 UAH62,796 UAH66,203 UAH
Per 1 kW7,370 UAH/kW7,476 UAH/kW7,881 UAH/kW
Yield1,266 kWh/kW · 10,638 kWh/year1,139 kWh/kW · 9,566 kWh/year1,043 kWh/kW · 8,762 kWh/year
Strength σ/fy58%79%84%
Deflection / (L/200)43%58%62%
Rafter strength88%81%87%
Post utilisation17%23%25%
Utilisation93%95%95%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 278, cantilever 825 mm → strength 88%.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 278, cantilever 825 mm → strength 81%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 278, cantilever 825 mm → strength 87%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.4 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 93%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.8 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 95%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.6 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 95%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 870 mm, 5 frames. Purlin C-channel 60×40×2: strength 84%, deflection 62% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2665
П2Rear postTube 60×60×23,4055
Кр1Rafter (inclined beam)C-channel 80×40×23,9285
Пк1Frame strutC-channel 60×40×21,8125
Х1Longitudinal brace (cross)C-channel 60×40×22,4984
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×22,0582
Р4Purlin (rail)C-channel 60×40×22,0582
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×90 set · strut to post — through spacer inserts——5
—Bolt M10×100 set · purlin to rafter——20
—Bolt M10×130 set · post–rafter — through spacer inserts——20
—Bolt M10×140 set · strut to rafter — through spacer inserts——5
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 33 mm——8
—Mid clamp (30–40 mm)——20
—Bolt M8×50 + channel nut——28
—Concrete for 10 posts, Ø350×1100——1.16 m³

Profile cutting

19 bars of 6,000 mm, 99.3 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 80×40×25 bars
  • C-channel 60×40×29 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
40,626₴
With installation and delivery
62,796₴
Per 1 kW
7,476UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 9,566 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×6 layout with other panels

Next