Section of the table from the Solispec engine (median zone — Cherkasy)

Leapton

Ground frame for 30 Leapton LP210*210-M-66-NB 700W panels (2×15)

2 rows of 15 panels, 21.00 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
21.00kW
Steel
667.1kg
Posts
22
Bolts
232
Materials
82,393₴
Yield
23,914kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Leapton LP210*210-M-66-NB 700W panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames11 frames, pitch up to 1,940 mm11 frames, pitch up to 1,940 mm11 frames, pitch up to 1,940 mm
Posts222222
Footings (bored concrete)22 pcs, Ø400 mm, depth 1,100 mm22 pcs, Ø350 mm, depth 1,100 mm22 pcs, Ø300 mm, depth 1,300 mm
Concrete3.35 m³2.56 m³2.22 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,289 mm600 / 2,289 mm600 / 2,289 mm
Panel field size19,965 × 3,105 mm19,965 × 3,105 mm19,965 × 3,105 mm
Row spacing between tables (no shade on 21 December)10,740 mm at noon · 12,080 mm ±2 h11,900 mm at noon · 13,750 mm ±2 h13,050 mm at noon · 15,510 mm ±2 h
Steel623.9 kg667.1 kg682.9 kg
BoltsM10 — 168, M8 — 64M10 — 168, M8 — 64M10 — 168, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials83,133 UAH82,393 UAH89,092 UAH
With installation and delivery136,565 UAH136,320 UAH143,019 UAH
Per 1 kW6,503 UAH/kW6,491 UAH/kW6,810 UAH/kW
Yield1,266 kWh/kW · 26,595 kWh/year1,139 kWh/kW · 23,914 kWh/year1,043 kWh/kW · 21,906 kWh/year
Strength σ/fy62%85%91%
Deflection / (L/200)48%65%69%
Rafter strength92%81%87%
Post utilisation18%24%26%
Utilisation96%99%98%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 278, cantilever 825 mm → strength 92%.Cherkasy: Rafter Tube 60×60×2: span between posts 2 278, cantilever 825 mm → strength 81%.Chernihiv: Rafter Tube 60×60×2: span between posts 2 278, cantilever 825 mm → strength 87%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.9 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.2 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 99%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 11.0 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 98%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 940 mm, 11 frames. Purlin C-channel 60×40×2: strength 85%, deflection 65% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 940 mm, 11 frames. Purlin C-channel 60×40×2: strength 91%, deflection 69% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,27411
П2Rear postTube 60×60×23,41411
Кр1Rafter (inclined beam)Tube 60×60×23,92811
Пк1Frame strutC-channel 60×40×21,82011
Х1Longitudinal brace (cross)C-channel 60×40×22,5574
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×21,9652
Р8Purlin (rail)C-channel 60×40×21,9652
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——149
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——19
—End clamp 33 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×50 + channel nut——64
—Concrete for 22 posts, Ø350×1100——2.56 m³

Profile cutting

41 bars of 6,000 mm, 215.9 m of profile in total.

  • Tube 60×60×222 bars
  • C-channel 60×40×219 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
82,393₴
With installation and delivery
136,320₴
Per 1 kW
6,491UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm22 bar21027,720
C-channel 60×40×2, stock length 6 000 mm19 bar23026,220
C-channel connector (splice plate L 300)12 pcs901,080
Bolt M10×140 cl. 8.8 set — frame, struts55 pcs221,210
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors111 pcs222,442
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts19 pcs27513
End clamp 33 mm8 pcs35280
Mid clamp (30–40 mm)56 pcs321,792
Bolt M8×50 A2 + spring channel nut M871 pcs14994
Post base anchor pin (M10 / rebar Ø12)22 pcs20440
Borehole casing (roofing felt / PVC, 300 mm)22 pcs601,320
Crushed stone 20–40 for the bottom of the boreholes0.21 m³900189
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow47 m351,645
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts2.56 m³3,8009,728
Rebar Ø10 (4 bars per post)115 m283,220
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 11 × 70 mm, 4 × 30 mm, 11 × 10 mm30 pcs00
Materials82,393

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 23,914 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×15 layout with other panels

Next