Section of the table from the Solispec engine (median zone — Cherkasy)

Leapton

Ground frame for 60 Leapton LP210*210-M-66-NB 700W panels (3×20)

3 rows of 20 panels, 42.00 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
42.00kW
Steel
1,741.1kg
Posts
38
Bolts
574
Materials
220,790₴
Yield
47,829kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Leapton LP210*210-M-66-NB 700W panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 41×41×2.5C-channel 41×41×2.5
Frames13 frames, pitch up to 2,160 mm19 frames, pitch up to 1,450 mm19 frames, pitch up to 1,450 mm
Posts263838
Footings (bored concrete)26 pcs, Ø500 mm, depth 1,500 mm38 pcs, Ø400 mm, depth 1,300 mm38 pcs, Ø350 mm, depth 1,500 mm
Concrete8.42 m³6.83 m³6.03 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,221 mm600 / 3,237 mm600 / 3,237 mm
Panel field size26,580 × 4,759 mm26,580 × 4,750 mm26,580 × 4,750 mm
Row spacing between tables (no shade on 21 December)16,130 mm at noon · 18,140 mm ±2 h17,880 mm at noon · 20,650 mm ±2 h19,600 mm at noon · 23,290 mm ±2 h
Steel1,352.5 kg1,741.1 kg1,768.4 kg
BoltsM10 — 340, M8 — 126M10 — 448, M8 — 126M10 — 448, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials191,200 UAH220,790 UAH218,519 UAH
With installation and delivery296,837 UAH325,824 UAH323,553 UAH
Per 1 kW7,068 UAH/kW7,758 UAH/kW7,704 UAH/kW
Yield1,266 kWh/kW · 53,190 kWh/year1,139 kWh/kW · 47,829 kWh/year1,043 kWh/kW · 43,811 kWh/year
Strength σ/fy82%88%94%
Deflection / (L/200)69%63%67%
Rafter strength97%87%93%
Post utilisation50%45%48%
Utilisation100%89%89%
Depth vs frost depthokokok
Bolt utilisation29%26%28%
Plate section6%5%6%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 160 mm, 13 frames. Purlin C-channel 60×40×2: strength 82%, deflection 69% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 450 mm, 19 frames. Purlin C-channel 41×41×2.5: strength 88%, deflection 63% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 450 mm, 19 frames. Purlin C-channel 41×41×2.5: strength 94%, deflection 67% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 673, cantilever 1 330 mm → strength 97%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 673, cantilever 1 330 mm → strength 87%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 673, cantilever 1 330 mm → strength 93%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 24.0 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 100%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.1 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 89%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 13.7 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 89%.
  • Stock length, mmKherson: Rafter 6 332 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 6 000, Кр1б 332 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 6 000 mm from the lower end of the rafter, where the moment is small. Bolt: 5.22 kN vs 18.00 kN (29%), plate 6%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 332 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 6 000, Кр1б 332 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 6 000 mm from the lower end of the rafter, where the moment is small. Bolt: 4.67 kN vs 18.00 kN (26%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 332 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 6 000, Кр1б 332 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 6 000 mm from the lower end of the rafter, where the moment is small. Bolt: 5.00 kN vs 18.00 kN (28%), plate 6%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,72619
П2Rear postTube 60×60×24,56219
Кр1аRafter (inclined beam)C-channel 100×50×2.56,00019
Кр1бRafter (inclined beam)C-channel 100×50×2.533219
Н1Rafter splice plateC-channel 100×50×2.530019
Пк1Frame strutC-channel 41×41×2.52,66019
Пк2Front frame strutC-channel 41×41×2.53,52619
Х1Longitudinal brace (cross)C-channel 41×41×2.52,9724
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.56,0003
Р8Purlin (rail)C-channel 41×41×2.56,0003
Р9Purlin (rail)C-channel 41×41×2.52,5803
Р10Purlin (rail)C-channel 41×41×2.52,5803
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——115
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——19
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——114
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——95
—Bolt M10×140 set · strut to rafter — through spacer inserts——19
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——76
—End clamp 33 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 38 posts, Ø400×1300——6.83 m³

Profile cutting

109 bars of 6,000 mm, 553.4 m of profile in total.

  • Tube 60×60×229 bars
  • C-channel 100×50×2.522 bars
  • C-channel 41×41×2.558 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
220,790₴
With installation and delivery
325,824₴
Per 1 kW
7,758UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm29 bar21036,540
C-channel 100×50×2.5, stock length 6 000 mm22 bar38050,160
C-channel 41×41×2.5, stock length 6 000 mm58 bar20069,600
C-channel connector (splice plate L 300)24 pcs902,160
Bolt M10×80 cl. 8.8 set — frame, struts19 pcs22418
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors96 pcs222,112
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts19 pcs27513
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter159 pcs274,293
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts95 pcs272,565
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts19 pcs27513
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)76 pcs221,672
End clamp 33 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)38 pcs20760
Borehole casing (roofing felt / PVC, 300 mm)38 pcs602,280
Crushed stone 20–40 for the bottom of the boreholes0.48 m³900432
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow70 m352,450
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml6 pcs3502,100
Concrete M200 for posts6.83 m³3,80025,954
Rebar Ø10 (4 bars per post)228 m286,384
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 19 × 70 mm, 19 × 50 mm, 4 × 30 mm, 19 × 10 mm65 pcs00
Materials220,790

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 47,829 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.