Section of the table from the Solispec engine (median zone — Cherkasy)

Aiko

Ground frame for 40 Aiko Comet 2N AIKO-A620-MAH72Mw panels (4×10)

4 rows of 10 panels, 24.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
24.80kW
Steel
1,417.1kg
Posts
24
Bolts
306
Materials
178,176₴
Yield
28,242kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Aiko Comet 2N AIKO-A620-MAH72Mw panel and the 4 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 80×80×3Tube 80×80×3Tube 80×80×3
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames9 frames, pitch up to 1,400 mm8 frames, pitch up to 1,600 mm8 frames, pitch up to 1,600 mm
Posts272424
Footings (bored concrete)27 pcs, Ø500 mm, depth 1,500 mm24 pcs, Ø500 mm, depth 1,500 mm24 pcs, Ø500 mm, depth 1,500 mm
Concrete8.75 m³7.78 m³7.78 m³
Tilt30°30°30°
Panel bottom / post top600 / 4,370 mm600 / 4,354 mm600 / 4,354 mm
Panel field size11,660 × 6,712 mm11,660 × 6,722 mm11,660 × 6,722 mm
Row spacing between tables (no shade on 21 December)20,980 mm at noon · 23,590 mm ±2 h23,250 mm at noon · 26,850 mm ±2 h25,480 mm at noon · 30,280 mm ±2 h
Steel1,561.7 kg1,417.1 kg1,417.1 kg
BoltsM10 — 240, M8 — 88M10 — 218, M8 — 88M10 — 218, M8 — 88
Panel clampsend 16, middle 72end 16, middle 72end 16, middle 72
Materials192,004 UAH178,176 UAH178,176 UAH
With installation and delivery254,658 UAH240,868 UAH240,868 UAH
Per 1 kW10,268 UAH/kW9,712 UAH/kW9,712 UAH/kW
Yield1,266 kWh/kW · 31,407 kWh/year1,139 kWh/kW · 28,242 kWh/year1,043 kWh/kW · 25,870 kWh/year
Strength σ/fy62%60%64%
Deflection / (L/200)43%37%40%
Rafter strength56%84%90%
Post utilisation23%34%37%
Post utilisation П37%11%11%
Utilisation90%90%88%
Depth vs frost depthokokok
Bolt utilisation35%50%54%
Plate section6%8%8%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 21.6 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 90%.Cherkasy: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 21.6 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 90%.Chernihiv: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 21.1 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 88%.
  • Stock length, mmKherson: Rafter 8 512 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 3 520, Кр1б 4 992 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 3 520 mm from the lower end of the rafter, where the moment is small. Bolt: 6.33 kN vs 18.00 kN (35%), plate 6%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 8 512 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 4 980, Кр1б 3 532 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 4 980 mm from the lower end of the rafter, where the moment is small. Bolt: 9.06 kN vs 18.00 kN (50%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 8 512 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 4 980, Кр1б 3 532 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 4 980 mm from the lower end of the rafter, where the moment is small. Bolt: 9.68 kN vs 18.00 kN (54%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter · C-channel 100×50×2.5 · 3 posts, spans between posts 3 022 mm, cantilever 1 234 mm — continuous beam on 3 supports → strength 84%.Chernihiv: Rafter · C-channel 100×50×2.5 · 3 posts, spans between posts 3 022 mm, cantilever 1 234 mm — continuous beam on 3 supports → strength 90%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 80×80×32,8578
П2Rear postTube 80×80×35,8798
П3Middle postTube 80×80×34,3688
Кр1аRafter (inclined beam)C-channel 100×50×2.54,9808
Кр1бRafter (inclined beam)C-channel 100×50×2.53,5328
Н1Rafter splice plateC-channel 100×50×2.53008
Пк1Frame strutC-channel 60×40×23,6458
Пк2Front frame strutC-channel 60×40×22,3068
Х1Longitudinal brace (cross)C-channel 60×40×24,0394
Р1Purlin (rail)C-channel 60×40×26,0004
Р2Purlin (rail)C-channel 60×40×26,0004
Р3Purlin (rail)C-channel 60×40×25,6604
Р4Purlin (rail)C-channel 60×40×25,6604
—Bolt M10×100 / M10×25 set · frame and struts / purlins, braces, connectors——42
—Bolt M10×120 set · purlin to rafter——64
—Bolt M10×140 set · strut to post——8
—Bolt M10×150 set · post–rafter, strut to rafter — through spacer inserts——56
—Bolt M10×160 set · brace to post — through spacer inserts——8
—Bolt M10×200 set · strut to rafter — through spacer inserts——8
—Bolt M10×25 set · rafter splice (plate Н1)——32
—End clamp 33 mm——16
—Mid clamp (30–40 mm)——72
—Bolt M8×50 + channel nut——88
—Concrete for 24 posts, Ø500×1500——7.78 m³

Profile cutting

64 bars of 6,000 mm, 332.4 m of profile in total.

  • Tube 80×80×320 bars
  • C-channel 100×50×2.516 bars
  • C-channel 60×40×228 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
178,176₴
With installation and delivery
240,868₴
Per 1 kW
9,712UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 26 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 80×80×3, stock length 6 000 mm20 bar42050,400
C-channel 100×50×2.5, stock length 6 000 mm16 bar38036,480
C-channel 60×40×2, stock length 6 000 mm28 bar23038,640
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×100 cl. 8.8 set — frame, struts8 pcs22176
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors34 pcs22748
Bolt M10×120 cl. 8.8 set — purlin to rafter86 pcs272,322
Bolt M10×140 cl. 8.8 set — strut to post8 pcs27216
Bolt M10×150 cl. 8.8 set — post–rafter, strut to rafter — through spacer inserts56 pcs271,512
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
Bolt M10×200 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)32 pcs22704
End clamp 33 mm16 pcs35560
Mid clamp (30–40 mm)72 pcs322,304
Bolt M8×50 A2 + spring channel nut M897 pcs141,358
Post base anchor pin (M10 / rebar Ø12)24 pcs20480
Borehole casing (roofing felt / PVC, 300 mm)24 pcs601,440
Crushed stone 20–40 for the bottom of the boreholes0.47 m³900423
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts7.78 m³3,80029,564
Rebar Ø10 (4 bars per post)164 m284,592
Spacer inserts / packs — pieces of the same profile (from offcuts): 16 × 80 mm, 4 × 61 mm, 4 × 20 mm24 pcs00
Materials178,176

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 28,242 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 4×10 layout with other panels

Next