Section of the table from the Solispec engine (median zone — Cherkasy)

Aiko

Ground frame for 60 Aiko Comet 2N AIKO-A620-MAH72Mw panels (3×20)

3 rows of 20 panels, 37.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
37.20kW
Steel
1,621.6kg
Posts
51
Bolts
548
Materials
180,993₴
Yield
42,363kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Aiko Comet 2N AIKO-A620-MAH72Mw panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 41×41×2.5C-channel 60×40×2
Frames11 frames, pitch up to 2,250 mm17 frames, pitch up to 1,420 mm14 frames, pitch up to 1,740 mm
Posts225142
Footings (bored concrete)22 pcs, Ø450 mm, depth 1,900 mm51 pcs, Ø400 mm, depth 1,100 mm42 pcs, Ø400 mm, depth 1,500 mm
Concrete7.31 m³7.76 m³8.71 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,151 mm600 / 3,386 mm600 / 3,370 mm
Panel field size23,200 × 4,639 mm23,200 × 4,968 mm23,200 × 4,977 mm
Row spacing between tables (no shade on 21 December)15,720 mm at noon · 17,680 mm ±2 h17,420 mm at noon · 20,120 mm ±2 h19,100 mm at noon · 22,700 mm ±2 h
Steel1,177.8 kg1,621.6 kg1,463.4 kg
BoltsM10 — 280, M8 — 126M10 — 422, M8 — 126M10 — 362, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials173,683 UAH180,993 UAH184,440 UAH
With installation and delivery267,450 UAH275,305 UAH278,760 UAH
Per 1 kW7,190 UAH/kW7,401 UAH/kW7,494 UAH/kW
Yield1,266 kWh/kW · 47,111 kWh/year1,139 kWh/kW · 42,363 kWh/year1,043 kWh/kW · 38,804 kWh/year
Strength σ/fy86%82%73%
Deflection / (L/200)76%58%50%
Rafter strength95%72%95%
Post utilisation49%46%60%
Utilisation91%100%88%
Depth vs frost depthokokok
Bolt utilisation26%17%23%
Plate section5%8%11%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3—14%18%
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 250 mm, 11 frames. Purlin C-channel 60×40×2: strength 86%, deflection 76% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 420 mm, 17 frames. Purlin C-channel 41×41×2.5: strength 82%, deflection 58% of L/200 (snow on panel 977 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 578, cantilever 1 295 mm → strength 95%.Chernihiv: Rafter · Tube 60×60×2 · 3 posts, spans between posts 2 191 mm, cantilever 894 mm — continuous beam on 3 supports → strength 95%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 900: 0.302 m³ of concrete per post. Wind uplift on the front post ≈ 24.1 kN (with γ=1.5) vs ≈ 26.7 kN (concrete weight + soil friction, estimate) → 91%.Cherkasy: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.3 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 100%.Chernihiv: Foundation Ø400 × 1 500: 0.188 m³ of concrete per post. Wind uplift on the front post ≈ 16.0 kN (with γ=1.5) vs ≈ 18.2 kN (concrete weight + soil friction, estimate) → 88%.
  • Stock length, mmKherson: Rafter 6 169 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 869 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 4.61 kN vs 18.00 kN (26%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 169 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 869 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 3.88 kN vs 22.27 kN (17%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 169 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 869 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 5.09 kN vs 22.27 kN (23%), plate 11%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,32117
П2Rear postTube 60×60×24,51117
П3Middle postTube 60×60×23,41617
Кр1аRafter (inclined beam)Tube 60×60×230017
Кр1бRafter (inclined beam)Tube 60×60×25,86917
Н1Rafter splice plateTube 60×60×230017
Пк1Frame strutC-channel 41×41×2.52,80717
Пк2Front frame strutC-channel 41×41×2.51,81917
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0884
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.55,2003
Р8Purlin (rail)C-channel 41×41×2.55,2003
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——312
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×150 set · strut to rafter — through spacer inserts——34
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×140 set · rafter splice (plate Н1)——68
—End clamp 33 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 51 posts, Ø400×1100——7.75 m³

Profile cutting

92 bars of 6,000 mm, 514.4 m of profile in total.

  • Tube 60×60×251 bars
  • C-channel 41×41×2.541 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
180,993₴
With installation and delivery
275,305₴
Per 1 kW
7,401UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm51 bar21064,260
C-channel 41×41×2.5, stock length 6 000 mm41 bar20049,200
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×140 cl. 8.8 set — frame, struts136 pcs222,992
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors219 pcs224,818
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×150 cl. 8.8 set — strut to rafter — through spacer inserts34 pcs27918
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×140 cl. 8.8 set — rafter splice (plate Н1)68 pcs221,496
End clamp 33 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)51 pcs201,020
Borehole casing (roofing felt / PVC, 300 mm)51 pcs603,060
Crushed stone 20–40 for the bottom of the boreholes0.64 m³900576
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow63 m352,205
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml6 pcs3502,100
Concrete M200 for posts7.75 m³3,80029,450
Rebar Ø10 (4 bars per post)266 m287,448
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 34 × 70 mm, 4 × 30 mm, 34 × 10 mm76 pcs00
Materials180,993

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 42,363 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.