Section of the table from the Solispec engine (median zone — Cherkasy)

Aiko

Ground frame for 20 Aiko Comet 2N AIKO-A620-MAH72Mw panels (2×10)

2 rows of 10 panels, 12.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
12.40kW
Steel
423.6kg
Posts
16
Bolts
150
Materials
53,459₴
Yield
14,121kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Aiko Comet 2N AIKO-A620-MAH72Mw panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames7 frames, pitch up to 1,850 mm8 frames, pitch up to 1,600 mm7 frames, pitch up to 1,850 mm
Posts141614
Footings (bored concrete)14 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete2.13 m³1.37 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,243 mm600 / 2,243 mm600 / 2,235 mm
Panel field size11,660 × 3,026 mm11,660 × 3,026 mm11,660 × 3,031 mm
Row spacing between tables (no shade on 21 December)10,470 mm at noon · 11,770 mm ±2 h11,600 mm at noon · 13,400 mm ±2 h12,720 mm at noon · 15,110 mm ±2 h
Steel390.7 kg423.6 kg397.5 kg
BoltsM10 — 96, M8 — 44M10 — 106, M8 — 44M10 — 96, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials52,935 UAH53,459 UAH60,913 UAH
With installation and delivery85,017 UAH85,464 UAH92,995 UAH
Per 1 kW6,856 UAH/kW6,892 UAH/kW7,500 UAH/kW
Yield1,266 kWh/kW · 15,704 kWh/year1,139 kWh/kW · 14,121 kWh/year1,043 kWh/kW · 12,935 kWh/year
Strength σ/fy55%56%80%
Deflection / (L/200)40%35%58%
Rafter strength83%97%82%
Post utilisation16%19%24%
Utilisation89%95%91%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 219, cantilever 803 mm → strength 83%.Cherkasy: Rafter C-channel 60×40×2: span between posts 2 219, cantilever 803 mm → strength 97%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 219, cantilever 803 mm → strength 82%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.9 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.0 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 95%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.1 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 91%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 850 mm, 7 frames. Purlin C-channel 60×40×2: strength 80%, deflection 58% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2598
П2Rear postTube 60×60×23,3688
Кр1Rafter (inclined beam)C-channel 60×40×23,8268
Пк1Frame strutC-channel 60×40×21,7808
Х1Longitudinal brace (cross)C-channel 60×40×22,2734
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×25,6602
Р4Purlin (rail)C-channel 60×40×25,6602
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——32
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×130 set · post–rafter — through spacer inserts——32
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 33 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×50 + channel nut——44
—Concrete for 16 posts, Ø300×1100——1.37 m³

Profile cutting

26 bars of 6,000 mm, 145.6 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 60×40×218 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
53,459₴
With installation and delivery
85,464₴
Per 1 kW
6,892UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 14,121 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×10 layout with other panels

Next