Section of the table from the Solispec engine (median zone — Cherkasy)

Aiko

Ground frame for 30 Aiko Comet 2N AIKO-A620-MAH72Mw panels (3×10)

3 rows of 10 panels, 18.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
18.60kW
Steel
863.8kg
Posts
27
Bolts
280
Materials
96,309₴
Yield
21,181kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Aiko Comet 2N AIKO-A620-MAH72Mw panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5Tube 60×60×2C-channel 100×50×2.5
Purlins and bracesC-channel 60×40×2C-channel 41×41×2.5C-channel 60×40×2
Frames6 frames, pitch up to 2,200 mm9 frames, pitch up to 1,400 mm8 frames, pitch up to 1,600 mm
Posts122716
Footings (bored concrete)12 pcs, Ø500 mm, depth 1,500 mm27 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø350 mm, depth 1,500 mm
Concrete3.89 m³4.11 m³2.54 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,151 mm600 / 3,386 mm600 / 3,151 mm
Panel field size11,660 × 4,639 mm11,660 × 4,968 mm11,660 × 4,639 mm
Row spacing between tables (no shade on 21 December)15,720 mm at noon · 17,680 mm ±2 h17,420 mm at noon · 20,120 mm ±2 h19,100 mm at noon · 22,700 mm ±2 h
Steel625.2 kg863.8 kg757.6 kg
BoltsM10 — 142, M8 — 66M10 — 214, M8 — 66M10 — 178, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials89,228 UAH96,309 UAH99,066 UAH
With installation and delivery136,723 UAH144,201 UAH146,460 UAH
Per 1 kW7,351 UAH/kW7,753 UAH/kW7,874 UAH/kW
Yield1,266 kWh/kW · 23,556 kWh/year1,139 kWh/kW · 21,181 kWh/year1,043 kWh/kW · 19,402 kWh/year
Strength σ/fy82%80%62%
Deflection / (L/200)71%55%39%
Rafter strength93%71%97%
Post utilisation48%45%50%
Utilisation98%98%95%
Depth vs frost depthokokok
Bolt utilisation25%17%26%
Plate section5%8%5%
Not includedengineer to checkengineer to checkengineer to check
Post utilisation П3—14%—
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 82%, deflection 71% of L/200 (snow on panel 489 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 578, cantilever 1 295 mm → strength 93%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 578, cantilever 1 295 mm → strength 97%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø500 × 1 500: 0.295 m³ of concrete per post. Wind uplift on the front post ≈ 23.6 kN (with γ=1.5) vs ≈ 24.0 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 98%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.7 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 95%.
  • Stock length, mmKherson: Rafter 6 169 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 869 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 4.51 kN vs 18.00 kN (25%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 169 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 869 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 3.83 kN vs 22.27 kN (17%), plate 8%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 169 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 300, Кр1б 5 869 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 300 mm from the lower end of the rafter, where the moment is small. Bolt: 4.68 kN vs 18.00 kN (26%), plate 5%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,3219
П2Rear postTube 60×60×24,5119
П3Middle postTube 60×60×23,4169
Кр1аRafter (inclined beam)Tube 60×60×23009
Кр1бRafter (inclined beam)Tube 60×60×25,8699
Н1Rafter splice plateTube 60×60×23009
Пк1Frame strutC-channel 41×41×2.52,8079
Пк2Front frame strutC-channel 41×41×2.51,8199
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0794
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.55,6603
Р4Purlin (rail)C-channel 41×41×2.55,6603
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——152
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×150 set · strut to rafter — through spacer inserts——18
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×140 set · rafter splice (plate Н1)——36
—End clamp 33 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 27 posts, Ø400×1100——4.11 m³

Profile cutting

49 bars of 6,000 mm, 274.4 m of profile in total.

  • Tube 60×60×227 bars
  • C-channel 41×41×2.522 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
96,309₴
With installation and delivery
144,201₴
Per 1 kW
7,753UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm27 bar21034,020
C-channel 41×41×2.5, stock length 6 000 mm22 bar20026,400
C-channel connector (splice plate L 300)6 pcs90540
Bolt M10×140 cl. 8.8 set — frame, struts72 pcs221,584
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors102 pcs222,244
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×150 cl. 8.8 set — strut to rafter — through spacer inserts18 pcs27486
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×140 cl. 8.8 set — rafter splice (plate Н1)36 pcs22792
End clamp 33 mm12 pcs35420
Mid clamp (30–40 mm)54 pcs321,728
Bolt M8×50 A2 + spring channel nut M873 pcs141,022
Post base anchor pin (M10 / rebar Ø12)27 pcs20540
Borehole casing (roofing felt / PVC, 300 mm)27 pcs601,620
Crushed stone 20–40 for the bottom of the boreholes0.34 m³900306
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow35 m351,225
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts4.11 m³3,80015,618
Rebar Ø10 (4 bars per post)141 m283,948
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 18 × 70 mm, 4 × 30 mm, 18 × 10 mm44 pcs00
Materials96,309

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 21,181 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.