Solar plant: site data

Solar power plant in Krasnosyolovka, Bilohirskyi Raion, Autonomous Republic of Crimea

Krasnosyolovka: 1,212 kWh per kWp a year, tilt 34° 7° east of south (PVGIS). 5.6% below the oblast median (1,284). #137 of 139 in the rayon, #1021 of 1025 in the oblast.

Bilohirsk, the rayon centre, is 14 km away. 382 m above sea level. 14 km away: Bilohirsk, the nearest bigger centre, 1,261 — 3.9% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 246 km. 8.01 m between rows, pitch 11.98 m (latitude 44.9°).

Yield of 1 kWp
1,212kWh/year
Tilt
34°7° east of south
10 kW
12,116kWh/year
Row pitch
11.98m · GCR 0.40
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Krasnosyolovka

The designer opens with this place’s coordinates, latitude 44.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 246 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan63Feb94Mar121Apr135May136Jun144Jul148Aug120Sep94Oct62Nov46Dec

August: 148 kWh/kWp, December: 46 — 3.2 times less.

March: 94 against 106 in the oblast, 11.3% less.

Krasnosyolovka: plants, kWh
kWpA yearAugustDecember
56,058740230
1012,1161,480460
1518,1742,220690

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.