Solar plant: site data
Solar power plant in Pchelinoye, Bilohirskyi Raion, Autonomous Republic of Crimea
Pchelinoye: 1,186 kWh per kWp a year, tilt 33° 8° east of south (PVGIS). 7.6% below the oblast median (1,284). #139 of 139 in the rayon, #1024 of 1025 in the oblast.
Bilohirsk, the rayon centre, is 14 km away. 552 m above sea level — above 500 m the DBN snow and wind are higher. 14 km away: Bilohirsk, the nearest bigger centre, 1,261 — 5.9% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 241 km. 7.81 m between rows, pitch 11.82 m (latitude 44.9°).
- Yield of 1 kWp
- 1,186kWh/year
- Tilt
- 33°8° east of south
- 10 kW
- 11,863kWh/year
- Row pitch
- 11.82m · GCR 0.40
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Pchelinoye
The designer opens with this place’s coordinates, latitude 44.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 241 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 147 kWh/kWp, December: 36 — 4.1 times less.
December: 36 against 45 in the oblast, 20.0% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,932 | 735 | 180 |
| 10 | 11,863 | 1,470 | 360 |
| 15 | 17,795 | 2,205 | 540 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Krasnosyolovka7 km1,212 kWh/kWp
- Golovanovka8 km1,233 kWh/kWp
- Karasyovka8 km1,231 kWh/kWp
- Yakovlevka9 km1,240 kWh/kWp
- Novoklyonovo9 km1,252 kWh/kWp
- Balki10 km1,240 kWh/kWp
All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.