Solar plant: site data

Solar power plant in Karasyovka, Bilohirskyi Raion, Autonomous Republic of Crimea

Karasyovka: 1,231 kWh per kWp a year, tilt 35° 3° east of south (PVGIS). 4.1% below the oblast median (1,284). #130 of 139 in the rayon, #1011 of 1025 in the oblast.

Bilohirsk, the rayon centre, is 7 km away. 256 m above sea level. 7 km away: Bilohirsk, the nearest bigger centre, 1,261 — 2.4% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 239 km. 8.25 m between rows, pitch 12.17 m (latitude 45.0°).

Yield of 1 kWp
1,231kWh/year
Tilt
35°3° east of south
10 kW
12,308kWh/year
Row pitch
12.17m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Karasyovka

The designer opens with this place’s coordinates, latitude 45.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 239 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

52Jan65Feb95Mar121Apr136May136Jun144Jul148Aug122Sep97Oct65Nov49Dec

August: 148 kWh/kWp, December: 49 — 3.0 times less.

January: 52 against 47 in the oblast, 10.6% more.

Karasyovka: plants, kWh
kWpA yearAugustDecember
56,154740245
1012,3081,480490
1518,4622,220735

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.