Solar plant: site data

Solar power plant in Krinichnoye, Bilohirskyi Raion, Autonomous Republic of Crimea

Krinichnoye: 1,239 kWh per kWp a year, tilt 35° 4° east of south (PVGIS). 3.5% below the oblast median (1,284). #118 of 139 in the rayon, #995 of 1025 in the oblast.

Bilohirsk, the rayon centre, is 4 km away. 231 m above sea level. 4 km away: Bilohirsk, the nearest bigger centre, 1,261 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 237 km. 8.26 m between rows, pitch 12.18 m (latitude 45.0°).

Yield of 1 kWp
1,239kWh/year
Tilt
35°4° east of south
10 kW
12,391kWh/year
Row pitch
12.18m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Krinichnoye

The designer opens with this place’s coordinates, latitude 45.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 237 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan64Feb97Mar123Apr136May136Jun145Jul149Aug124Sep98Oct66Nov50Dec

August: 149 kWh/kWp, December: 50 — 3.0 times less.

December: 50 against 45 in the oblast, 11.1% more.

Krinichnoye: plants, kWh
kWpA yearAugustDecember
56,196745250
1012,3911,490500
1518,5872,235750

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilohirskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.